Sorry, you need to enable JavaScript to visit this website.

Tender Evaluation Result

Sr. No Title Tender Date Document
1 Consultancy Services of Authority's Engineer for Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH-206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya 10-07-2025 Size: 577.18 KB
2 Strengthening of Churachandpur to Imphal section of old NH-150 (new NH-02) from Churachandpur Police Station (km 402+000) to Malom Oil Depot Gate (km 454+798) in the State of Manipur on EPC mode under NH(O)-NE (Length-53.400 km) 03-07-2025 Size: 256.21 KB
3 Short Term Maintenance Contract for Maintenance and Repair of 4-laning of Dimapur- Kohima section on NH-29 from Km 123.840 to Km 138.775 in the state of Nagaland in FY 2025-26 Percentage Rate and work Order Basis 24-06-2025 Size: 979.99 KB
4 Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge along with its approaches connecting NH-10 with NH-510 near Singtam, development of its junction and identification & realignment from Km 0+000 to Km 3+074 (S 06-06-2025 Size: 692 KB
5 Consultancy services for preparation of Detailed ProjectReport and Pre-construction activities in respect ofconstruction/ widening of existing carriageway into 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / 06-06-2025 Size: 581.43 KB
6 Consultancy Services for Authority's Engineer for supervision of (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagara 05-06-2025 Size: 2.02 MB
7 Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode 08-04-2025 Size: 342.6 KB
8 Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118+850 to km 132+037 (Package-4A) in the State of Manipur on EPC Mode 08-04-2025 Size: 344.9 KB
9 Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode 28-03-2025 Size: 558.93 KB
10 Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya. 28-03-2025 Size: 382.45 KB
11 Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118+850 to km 132+037 (Package-4A) in the State of Manipur on EPC Mode 28-03-2025 Size: 557.51 KB
12 Consultancy Services as Authority’s Engineer for Supervision of Construction of Four laning of N. Kawnpui (N. Mualvvum) – Mualkhang via Khamrang Village section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+850 to km 123+400) on Silchar – Vairengte – Sairang road in the State of Mizoram on EPC mode & Construction of Four laning of Mualkhang – Sairang Section (Package-8) of NH-6 from existing chainage km 142+000 to km 158+900 (Design Chainage km 123+400 to km 136+260) on Silchar – Vairengte – Sairang road in the State of Mizoram on EPC mode 28-03-2025 Size: 650.66 KB
13 4 – Laning of Silchar (near Budha Nagar) at Existing Km 233+000 (D. Ch.24+560) to Jiribam at Existing km 212+060 (D. Ch. 37+650) of NH-37 (Length: 13.09 km) in the State of Assam and Manipur under NH(O)-NE on Hybrid Annuity Mode (HAM) (Pkg-2) 27-03-2025 Size: 466.19 KB
14 Consultancy Services as Authority’s Engineer for Supervision during O&M period for “(i) 1000 m length Viaduct at Rangpo between Km 51.10 to Km 53.90 on Sevoke-Gangtok Road, NH-10 (Old NH-31A) in the State of West Bengal/Sikkim (ii) 2-lane with paved shoulder road from km 0.000 to km 26.706 in Rhenock-Rorathang-Pakyong of NH 717-A in the state of Sikkim (iii) Two Lane “Chisopani Traffic Tunnel” of length 250m including approaches from Km 67.080 – Km 67+500 on NH-10 in East District of Sikkim (iv) 2-lane with paved shoulders road from km 0.00 to km 16.00 (Singtam-Tarku) of NH-510 in the State of 27-03-2025 Size: 593.01 KB
15 Construction of 2-laning with Paved/ Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State of Nagaland on EPC Mode 20-03-2025 Size: 438.95 KB
16 Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH-206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya 19-03-2025 Size: 1.61 MB
17 Consultancy Services as Independent Engineer during Operation and Maintenance of Z-Morh tunnel including approaches on Srinagar Sonamarg section connecting National Highway no. 1 in the UT of J&K on DBFOT annuity basis 18-03-2025 Size: 295.37 KB
18 Consultancy Services as Authority’s Engineer for Supervision during O&M period for “(i) 1000 m length Viaduct at Rangpo between Km 51.10 to Km 53.90 on Sevoke-Gangtok Road, NH-10 (Old NH-31A) in the State of West Bengal/Sikkim (ii) 2-lane with paved shoulder road from km 0.000 to km 26.706 in Rhenock-Rorathang-Pakyong of NH 717-A in the state of Sikkim (iii) Two Lane “Chisopani Traffic Tunnel” of length 250m including approaches from Km 67.080 – Km 67+500 on NH-10 in East District of Sikkim (iv) 2-lane with paved shoulders road from km 0.00 to km 16.00 (Singtam-Tarku) of NH-510 in the State of 10-03-2025 Size: 770.52 KB
19 Balance work for construction of 2-Lane with Hard Shoulders of Demwe Brahmakund Section of NH-13 from Ch. 0.000 Km to 18.464 Km in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE 10-03-2025 Size: 449.79 KB
20 Short Term Maintenance Contract for Protection of hill slope and Restoration of approach road of 4-laning of Dimapur-Kohima section on NH-29 from Km 142.400 to Km 142.450 in the state of Nagaland in FY 2024-25 Percentage Rate and work Order Basis 01-03-2025 Size: 396.35 KB
21 Short Term Maintenance Contract for Restoration of 4-laning of Dimapur-Kohima section on NH-29 from Km 126+600 to Km 126+800 in the state of Nagaland in FY: 2024- 25 (Percentage Rate and work Order Basis) at the Risk & Cost of EPC Contractor 28-02-2025 Size: 629.32 KB
22 Construction of 2-laning with Paved/ Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State of Nagaland on EPC Mode under NH (O) (Package-1A) under SARDPNE 25-02-2025 Size: 1.01 MB
23 Construction of Link Road from Bargana Vittage on Old Goha-Khettani Road to New NH-244 in the UT of Jammu & Kashmir in FY 2024-2i on EPC Mode 22-02-2025 Size: 761.86 KB
24 Short Term Maintenance Contract for Restoration of 4-laning of Dimapur-Kohima section on NH-29 from Km 126+080 to Km 126+240 in the state of Nagaland in FY: 2024-25 (Percentage Rate and work Order Basis) 19-02-2025 Size: 1.03 MB
25 Short Term Maintenance Contract for Balance works of NH-39 New NH-02 from Kohima to Mao Stretch from Km 185.540 to Km 212.334 Length 26.794 Km in the State of Nagaland in the FY 2024-25 – Percentage Rate and Work Order Basis 17-02-2025 Size: 676.04 KB
26 Balance work for construction of 2-Lane with Hard Shoulders of Demwe-Brahmakund Section of NH-13 from Ch. 0.000 Km to 18.464 Km in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE 13-02-2025 Size: 933.83 KB
27 Providing the Services of Vehicle(Bolero) on Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim) 05-02-2025 Size: 60.96 KB
28 Providing the Services of Vehicle(Scorpio) on Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim) 05-02-2025 Size: 78.4 KB
29 Widening to 2 (Two) Lane with Paved Shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 15.940 to km 33.120 (Existing Chainage km 15.946 to km 33.955) (Length = 17.180 km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construction (EPC) Mode – Balance Works & Rectification Works 31-01-2025 Size: 564.49 KB
30 Construction Four laning of N. Kawnpui (N. Mualvum) –Mualkhang via Khamrang Village section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+850 to km 123+400) on Silchar – Vairengte – Sairang road in the State of Mizoram on EPC mode & Construction of Four Laning of Mualkhang – Sairang Section (Package 8) of NH-6 from existing chainage km142+000 to km158+900 (Design Chainage km 123+400 to km 136+260) on Silchar-Vairengte – Sairang road in the state of Mizoram on EPC mode 28-01-2025 Size: 566.44 KB
31 Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (P-2) on Sairang – Phaibawk section of NH-6 in the Mizoram 28-01-2025 Size: 277.82 KB
32 RFP for Consultancy services as Authority’s Engineer for Supervision of: (i) Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: 24.819 Km, Package-I) in the state of Arunachal Pradesh on EPC mode. (ii) Improvement and Widening to two lane with Paved Shoulder of NH-15 (Old NH-52) from Existing Km 770.600 (Design Km 24.819) to Existing km 805.750 (Design Km 59.885) (Kamlang T-Junction to Cho 28-01-2025 Size: 637.75 KB
33 Widening to 2 (Two) Lane with Paved Shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 15.940 to km 33.120 (Existing Chainage km 15.946 to km 33.955) (Length = 17.180 km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construction (EPC) Mode – Balance Works & Rectification Works 27-01-2025 Size: 846.69 KB
34 Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis 27-01-2025 Size: 327.58 KB
35 Consultancy Services as Authority’s Engineer for Supervision of construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode 24-01-2025 Size: 1.14 MB
36 Restoration of road by way of clearance of landslide, surface boulders including construction of R/walls and B/walls and laying of WBM-III & Bituminous Carpeting on Chatroo-Singpora link road from Km 0.000 to 19.600 in the UT of J&K.for FY 2024-25 16-01-2025 Size: 527.05 KB
37 Balance work Construction of High-Altitude Hill Road from Doginala to Gau from KM 0+000 to KM 15+918 in Upper Subansiri District of the State of Arunachal Pradesh on EPC Mode 16-01-2025 Size: 234.19 KB
38 Balance work Construction of High-Altitude Hill Road from Doginala to Gau from KM 0+000 to KM 15+918 in Upper Subansiri District of the State of Arunachal Pradesh on EPC Mode 01-01-2025 Size: 849.2 KB