S.No. | Subject | Project Name | Date Sort ascending | Document |
---|---|---|---|---|
1 | Termination Notice to DPR Consultant M/s HOLTEC Consulting Pvt. Ltd. | Rehabilitation and Up-gradation of Nongstoin - Rambrai - Kyrshai road upto Meghalaya -Assam Border from Km. 0+335 to 34+039 to 2-lane under SARDP-NE “Phase-A”, in the State of Meghalaya on EPC Mode (Package-I) & Rehabilitation & Up-gradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam border from Km 35.155 to Km 72.600 in the State of Meghalaya (Package-II) | 10-07-2025 | ![]() |
2 | Termination of contract of M/s J Infratech Limited (formerly known as Jandu Construction India Pvt. Ltd.) -M/s OJSC Euro-Asian Construction Corporation "EVRASCON" (JV) | Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080 (Total length:13.080 km) of Tuting–Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode | 06-06-2025 | ![]() |
3 | Termination of contract of M/s CMM Infra projects Ltd | 30-01-2025 | ![]() |
|
4 | Termination of contract of M/s KCC Buildcon Pvt. Ltd. | 02-12-2024 | ![]() |
|
5 | Termination of contract of M/s Indo Engineering Project Corporation | Construction of High-Altitude Hill Road from Doginala to Gau from KM 0+000 to KM 15+320 in Upper Subansiri District of the State of Arunachal Pradesh on EPC Mode | 28-08-2024 | ![]() |
6 | Termination of contract of M/s Simplex Infrastructures Limited. | Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-1) of Srirampur Dhubri Section of NH-127B from existing Km 0.000 to Km 28.050 (Design Km 0.000 to Km 27.650), (Design Length 27.650 Km) on EPC Mode in the State of Assam under JICA ODA loan assistance: Termination of Contract under Clause 23.1(ii) of the Contract Agreement-Reg. | 24-06-2024 | ![]() |
7 | Termination of Contract of M/s AK Construction Company | Rehabilitation and Up-gradation of road from design Km 25.250 to Km 36.460 (Total Length: 11.210 Km) of Kailashahar - Kurti Bridge section of NH-208A to two lane with paved shoulder in the State of Tripura on EPC basis (Package-Ill)- Termination Notice under Clause 23.1 of Contract Agreement. |
21-07-2023 | ![]() |
8 | Termination of Contract of M/s KLD Creation Infrastructure Pvt. Ltd. | Rehabilitation and up-gradation of road from design Km 19.300 to Km 31.300 (Total length =12.000 Km) of Agartala-Khowai section on NH-108B to two lanes with paved shoulders in the State of Tripura on EPC mode (Package-Il)- Termination under Article 23.1 (ii) of the Contract Agreement. |
18-07-2023 | ![]() |
9 | Termination of contract of M/s Aushta Consulting Engineers Pvt. Ltd. in JV with DN Consultant in association with NM Engineering and Consultant. | Consuttancy Services for Authority's Engineer for supervision of "lmprovement/Widening to 2-tane with earthen shoutders of Ranikor-MaheshkhotaBaghmara road section (i) Package - lV from Kanai to Rongara, existing chainage from Km 85+970 to 102+345 (Design chainage from 81+100 to 96+000) design length - 14.763 Km and (ii) Package - V from Rongara to Panda, existing chainage from Km 102+345 to Km 119.810 ( Design chainage from Km 96+000 to Km 112.300) design tength - 16.300 Km on EPC Mode under SARDP - NE 'Phase A' in the State of Meghataya.": Notice for Termination of Contract as per Clause 2.9.1 of the Contract Agreement - reg. |
06-07-2023 | ![]() |
10 | Termination of contract of M/s Mantena Vasishta Bridge (JV). | Construction of Major bridge over Middle Strait Creek between km 106.59 to km 107.762 of NH-223 (New NH-4) connecting South Andaman & Baratang Islands in the Union territory of Andaman and Nicobar Islands on EPC basis: Termination of Contract under Clause 23.1 of Contract Agreement-reg. | 06-07-2023 | ![]() |
11 | Termination of contract of M/s ARSS Infrastructure Projects Ltd. | Improvement/Widening to 2-lane with paved shoulders/4-laning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from Km 93.490 to Km 123.800 (design Km 10.670 to Km 37.550) design length 26.55 km (Package-ll) in the State of Meghalaya in EPC mode under JICA funding: Termination Notice under Clause 23.1.2 of the Contract Agreement-reg. | 25-05-2023 | ![]() |
12 | Restoration & Rehabilitation of Imphal-Jiribam road in state of Manipur on Item Rate Basis (3rd Call)- Termination Notice in Pursuant to clause 53.1 & 53.2(a)&(i) of section V of the CA- M/s SL Infra Project (India) | Restoration & Rehabilitation of NH-02 of Imphal-Kohima Road (Daili to Kuraopokpi) from Km 274.610 to Km 297.700 in the state of Manipur on Item Rate Basis (2nd Call)- Termination Notice in Pursuant to Clause 53.1 & 53.2 (a) & (i) of Section V of the Contract Agreement-reg. | 20-04-2023 | ![]() |
13 | Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Uttarakhand and Sikkim in high altitude remote areas (Package-I). Termination of contract – M/s Hindustan windows Mfg. co. | Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Uttarakhand and Sikkim in high altitude remote areas (Package-l)- Termination-Order under Article 53 of the Contract -Agreementreg. | 03-04-2023 | ![]() |
14 | Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas (Package-II. Termination of contract – M/s Hindustan windows Mfg. co. | Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas (Package-ll)- Termination Order under Article 53 of the Contract Agreement- reg. | 03-04-2023 | ![]() |
15 | Termination of contract of Feedback Infra Pvt. Ltd. | Consultancy services for carrying out Feasibility study, preparation of Detailed Project Report and providing Pre-Construction services in respect of upgradation to two lanes with paved shoulder configuration of corridors under BHARATMALA project, NH connectivity to BRT places of the country and ADB funded projects in the state of Assam and West Bengal. - Termination of Consultancy Contract - Reg. | 01-02-2023 | ![]() |
16 | Construction/Upgradation of Existing road to 2 lane with paved shoulder including Geometric Improvement from Ranipool to Pakyong from km 2.000 to km 16.167 (Balance Work) of NH-717-A on EPC basis under SARDP-NE Phase ‘A’ in the state of Sikkim. Termination of contract – M/s Garg Sons Estate Promoters Pvt Ltd | Construction and Upgradation of Existing Road to 2-Lane with Paved Shoulder including Geometric Improvement from Ranipool to Pakyong from Km 2.000 to Km 16.167 (Balance Work) of NH-717 A on EPC basis under SARDP-NE Phase ‘A’ in the State of SikkimTermination under Article 23.1(ii) of the Contract Agreement-Reg. | 07-06-2022 | ![]() |
17 | Construction/Upgradation of Existing road to 2 lane with paved shoulder including Geometric Improvement from Ranipool to Pakyong from km 2.000 to km 16.167 (Balance Work) of NH-717-A on EPC basis under SARDP-NE Phase ‘A’ in the state of Sikkim. Termination of Contract – M/s NPCC LTD. | Construction and upgradation of existing road to 2-lane with Paved shoulder including geometric improvement from Ranipool to Pakyong from Km 0.00 to Km 16.167 of NH-717A on EPC basis under SARDP-NE Phase ‘A’ in the State of Sikkim - Termination of contract -Reg | 21-12-2021 | ![]() |
18 | Construction/Upgradation of Existing road to 2 lane with paved shoulder including Geometric Improvement from Ranipool to Pakyong from km 2.000 to km 16.167 (Balance Work) of NH-717-A on EPC basis under SARDP-NE Phase ‘A’ in the state of Sikkim. Termination of Contract – M/s NPCC LTD. | Construction and upgradation of existing road to 2-Lane with Paved Shoulder including geometric improvement from Ranipool to Pakyong from Km 0.000 to Km 16.167 of NH-717 A on EPC basis under SARDP-NE Phase ‘A’ in the State of Sikkim- Termination of Contract under Clause 23.1.2 of Contract Agreement -Reg. | 12-08-2021 | ![]() |
19 | Providing & Installation of Road Safety Measures by fixing of Traffic Sign Board, Construction of Metal Beam Crash Barrier, Road Stud & Road Marking on Shillong – Dawki road of NH-44 in the State of Meghalaya: Termination of Contract – M/s Real Concept. | Providing & installation of road safety measures by fixing of traffic signboartl, Construction of metal beam crash barrier, road studs & road marking of Shillong-Dawki road of NH-40 in the state of Meghalaya: Termination of Contract -Reg | 13-07-2021 | ![]() |
20 | Termination of Contract of Sh. Ram Niwas Ex-DGM (P) | With the approval of the Competent Authority of NHIDCL, the tenure of engagement of Contract of Sh. Ram Niwas, Deputy General Manager (P) in NHIDCL posted at PMU-Maram (Manipur) under Regional Office- Imphal (Manipur) stands terminated w.e.f. 11.02.2021 as he absconded and remained unauthorized absent from his duty since then. | 17-05-2021 | ![]() |
21 | Termination Letter of M/s S Hungyo for the project of Installation of Road Signages along i) Imphal-Jiribam road on NH-37(Km 3.00 to Km 221.138) Total Length = 218.138 km] in the state of Manipur in the year 2020- 2021. ii) Koubrulekha to Tendongyan section of Imphal Mao section on NH-39 (New NH-02) (Km -287.50 to Km 304.00) [Total Length = 16.500 km] in the state of Manipur in the year 2020-2021. iii) Churachandpur to Tipaimukh road from Km 0.00 to Km185.00 on NH-150 in the state of Manipur in the year 2020-2021. | Installation of Road Signages along i) Imphal-Jiribam road on NH-37(Km 3.00 to Km 221.138) Total Length - 218.138 km] in the state of Manipur in the year 2020- 2021. ii) Koubrulekha to Tendongyan section of Imphal Mao section on NH-39 (New NH-02) (Km -287.50 to Km 304.00) [Total Length = 16.500 km] in the state of Manipur in the year 2020-2021. iii) Churachandpur to Tipaimukh road from Km 0.00 to Km185.00 on NH-150 in the state of Manipur in the year 2020-2021-Termination of Contract- Reg. | 19-01-2021 | ![]() |
22 | Letter No. 867 Restoration/Rehabilitation of Churachandpur-Tipaimukh Road (NH-150) km 9.00 to 70.00 (Total Length -61 km) in the state of Manipur- Termination of contract – M/s S. Hungyo – reg. | Restoration/Rehabititation of Churachandpur-Tipaimukh Road (NH-150) km 9'00 to 70.00 (Totat Length -61 km) in the state of Manipur- Termination of contract - reg' | 27-10-2020 | ![]() |
23 | Termination of M/s Atlanta Limited, 101, Shree Amba Shanti Chambers, Opp. Hotel Leela, Andheri Kurla Road, Andheri (East), Mumbai- 400059. | Four laning of End of Moran By pass from (km. 561.700) to Bogibeel junction near Lapetketa (km. 580.778) of NH-37 in the State of Assam under SARDP-NE Phase- ‘A; Project | 23-02-2018 | ![]() |