Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
2791 |
RFP for Widening/Improvement to 2 (Two) lane with earthen shoulder of Marrem Khullen to Jessami section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 95.700 to km 140.180 (Package-6) in the State of Manipur on EPC mode under Bharatmala Pariyojana. Click Here | Manipur | 16-03-2023 |
2792 |
RFP for Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 53.110 to km 95.700 (Package-5) in the State of Manipur on EPC mode under Bharatmala Pariyojana. Click Here | Manipur | 16-03-2023 |
2793 |
RFP for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 55+000 (Nagabang Gamsuk) to km 82+514 (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode (Package-3) under Bharatmala Pariyojna of length 27.524 Km. Click Here | Assam | 16-03-2023 |
2794 |
RFP for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.177+372 km to Ch. 203+783 km (Design Ch.173+434km to Ch.200+750km) for Package-10 of Bilasipura- Guwahati road (NH 17) (Section: Milmila R.F (before Chayagaon Market) to Approach of Airport Junction(VIP Chowk)) in the state of Assam on EPC mode under Bharatmala Pariyojna of Length 27.316 km. Click Here | Assam | 16-03-2023 |
2795 |
RFP for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 136.500 near Hejaichak to km 156.489 near P. Leikul (Package-9) on EPC mode. Click Here | Assam | 16-03-2023 |
2796 |
RFP for Widening & Improvement to 2-lane with Paved shoulder configuration of Dudhnoi - Dainadubi section (NH-217) under Bharatmala Pariyojana from design km 0+000 to km 8+415 (existing km 0+000 to km 8+600 of Old NH-62) in the State of Assam on EPC mode. Click Here | Assam | 16-03-2023 |
2797 |
RFP for Four laning of Dhanehari – Lailapur / Vairengte section (Package-2) from Existing Chainage km 12+920 to km 43+000 of NH 306 (Design Chainage km 20+000 to km 49+360) on Silchar - Vairengte - Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. (Project Length – 29.360 km). Click Here | Assam | 16-03-2023 |
2798 |
RFP for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 156.489 near P. Leikul to km 176.581 near Borowapu (Package-10) on EPC mode. Click Here | Assam | 16-03-2023 |
2799 |
RFP for Improvement and Widening of National Highway No. 127B (Darugiri - Songsak - Williamnagar Junction Section) to two lane with paved shoulder from design Km 0+000 to Km 36+635 (Design Length= 36.635 Km) (existing Km 112+000 to Km 151+060 of Old NH-62) under Bharatmala Pariyojana (Lot-1) Pkg-1B on EPC mode in the state of Meghalaya. Click Here | Meghalaya | 16-03-2023 |
2800 |
RFP for Providing and installation of lighting arrangement for the project Four/Six laning from Km 132.375 to Km 153.058 (Total New Alignment length of 20.683 Km) of Daboka-Dimapur section of NH-36 & 39 in the State of Nagaland under SARDP-NE, Package Dimapur Bypass (Nagaland Portion) in the FY 2022-23\" (Percentage Rate and Work Order Basis, at “Risk and Cost†of EPC Contractor). Click Here | Nagaland | 16-03-2023 |