Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
2761 |
RFP for PROJECT MANAGEMENT CONSULTANCY (PMC) SERVICES FOR WORK OF CONSTRUCTION OF BUILDING FOR MILATRY ASSETS TO BE DEMOLISHED FOR UPGRADATION OF NH-40 SECTION BETWEEN SHILLONG-DAWKI ROAD UNDER NHIDCL IN SHILLONG, EAST KHASI HILLS DISTRICT, STATE OF MEGHALAYA. Click Here | Meghalaya | 25-02-2023 |
2762 |
RFP for Ordinary Repair of Ukhrul-Jessami Road section from Km 0.00 to Km 63.00 covering 63.00 Km length on NH 202 in the state of Manipur on Item Rate basis in FY 2022- 23 (Balance Work). Click Here | Manipur | 25-02-2023 |
2763 |
RFP for Improvement and Widening to two lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km 36.00 (near Rangamati) of NH 208 on Khowai – Teliamura- Harina section (Total length 37.24) (Package-II) in the state of Tripura on EPC mode under JICA ODA Loan Phase-6. Click Here | Tripura | 28-02-2023 |
2764 | RFP for Providing & supplying of commercial vehicles (SUV such as Scorpio or equivalent) on monthly basis for NHIDCL in the State of Mizoram. Click Here | Mizoram | 28-02-2023 |
2765 | RFP for Providing the Services of Vehicle [Inspection Vehicle - I] On Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim). Click Here | Sikkim | 28-02-2023 |
2766 | RFP for Providing the Services of Vehicle [Inspection Vehicle - II] On Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim). Click Here | Sikkim | 28-02-2023 |
2767 |
RFP for Improvement and Widening to Two Lane with paved shoulder of road from Km 101.300 to km 127.319 (Total Length 26.019 Km) i.e. the Khowai –Teliamura section of NH 208 (Package I) in the State of Tripura on EPC under JICA ODA Loan Phase –VI. Click Here | Tripura | 28-02-2023 |
2768 |
RFP for Improvement and Widening to two lane with paved shoulder of road from design Km 72.000 (Pati Chhari) to design Km 107.654 (Harina) (Total length 35.654 Km) on Teliamura to Harina section of NH 208 (Package-IV) in the state of Tripura on EPC mode under JICA ODA Loan Phase 6. Click Here | Tripura | 28-02-2023 |
2769 |
RFP for Improvement and Widening to two lane with paved shoulder of road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total length 36.000 Km) on Teliamura to Harina section of NH 208 (Package –III) in the state of Tripura on EPC mode under JICA ODA Loan Phase-6. Click Here | Tripura | 28-02-2023 |
2770 |
RFP for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.8 km).(2nd Call) Click Here | Assam | 02-03-2023 |