RFP for Widening/Improvement to 2 (Two) lane with earthen shoulder of Marrem Khullen to Jessami section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 95.700 to km 140.180 (Package-6) in the State of Manipur on EPC mode under Bharatmala Pariyojana. Click Here
RFP for Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 53.110 to km 95.700 (Package-5) in the State of Manipur on EPC mode under Bharatmala Pariyojana. Click Here
RFP for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 55+000 (Nagabang Gamsuk) to km 82+514 (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode (Package-3) under Bharatmala Pariyojna of length 27.524 Km. Click Here
RFP for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.177+372 km to Ch. 203+783 km (Design Ch.173+434km to Ch.200+750km) for Package-10 of Bilasipura- Guwahati road (NH 17) (Section: Milmila R.F (before Chayagaon Market) to Approach of Airport Junction(VIP Chowk)) in the state of Assam on EPC mode under Bharatmala Pariyojna of Length 27.316 km. Click Here
RFP for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 136.500 near Hejaichak to km 156.489 near P. Leikul (Package-9) on EPC mode. Click Here
RFP for Widening & Improvement to 2-lane with Paved shoulder configuration of Dudhnoi - Dainadubi section (NH-217) under Bharatmala Pariyojana from design km 0+000 to km 8+415 (existing km 0+000 to km 8+600 of Old NH-62) in the State of Assam on EPC mode. Click Here
RFP for Four laning of Dhanehari – Lailapur / Vairengte section (Package-2) from Existing Chainage km 12+920 to km 43+000 of NH 306 (Design Chainage km 20+000 to km 49+360) on Silchar - Vairengte - Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. (Project Length – 29.360 km). Click Here
RFP for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 156.489 near P. Leikul to km 176.581 near Borowapu (Package-10) on EPC mode. Click Here
RFP for Improvement and Widening of National Highway No. 127B (Darugiri - Songsak - Williamnagar Junction Section) to two lane with paved shoulder from design Km 0+000 to Km 36+635 (Design Length= 36.635 Km) (existing Km 112+000 to Km 151+060 of Old NH-62) under Bharatmala Pariyojana (Lot-1) Pkg-1B on EPC mode in the state of Meghalaya. Click Here
RFP for Providing and installation of lighting arrangement for the project Four/Six laning from Km 132.375 to Km 153.058 (Total New Alignment length of 20.683 Km) of Daboka-Dimapur section of NH-36 & 39 in the State of Nagaland under SARDP-NE, Package Dimapur Bypass (Nagaland Portion) in the FY 2022-23\" (Percentage Rate and Work Order Basis, at “Risk and Cost†of EPC Contractor). Click Here