Technical Evaluation Result for Maintenance Work of (i) from Km 96.254 Rishi Border to Km 101.554 (Rhenock Charpatak) of NH-717A, & (ii) from Km 0.000 (Rhenock Charpatak) to Km 15.300 (Rongli Bazaar) of NH-717B total length of 20.600 Km in the state of Si Read more about Technical Evaluation Result for Maintenance Work of (i) from Km 96.254 Rishi Border to Km 101.554 (Rhenock Charpatak) of NH-717A, & (ii) from Km 0.000 (Rhenock Charpatak) to Km 15.300 (Rongli Bazaar) of NH-717B total length of 20.600 Km in the state of Si
Technical Evaluation Result for Appointment of a Creative Agency for providing a creative/communication strategy and creative designs etc to the Ministry of Road Transport & Highways and its allied agencies. Dated : 18-05-2023. Read more about Technical Evaluation Result for Appointment of a Creative Agency for providing a creative/communication strategy and creative designs etc to the Ministry of Road Transport & Highways and its allied agencies. Dated : 18-05-2023.
Technical Evaluation Result for Empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 11-05-2023. Read more about Technical Evaluation Result for Empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 11-05-2023.
Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S Read more about Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S
Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “2-lane with Paved Shoulder of NHconfiguration for Baramulla-Gulmarg Road (approx length 42 Km)” Read more about Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “2-lane with Paved Shoulder of NHconfiguration for Baramulla-Gulmarg Road (approx length 42 Km)”
Technical Evaluation Result for Balance work for 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated : 04-05 Read more about Technical Evaluation Result for Balance work for 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated : 04-05
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “2- laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 02-05-2023. Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “2- laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 02-05-2023.
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930km to Ch.143+680 km (Design Ch.96+000km to Ch.139+750km) for Package-8 of BilasipuraG Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930km to Ch.143+680 km (Design Ch.96+000km to Ch.139+750km) for Package-8 of BilasipuraG
Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches (i) Seijosa to Pakke kessang (ii) Seppa to Chayangtajo (iii) Kamenbari to Tenga (iv) Jang to Lumla and (v) Lumla to Neliya (border) in the Read more about Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches (i) Seijosa to Pakke kessang (ii) Seppa to Chayangtajo (iii) Kamenbari to Tenga (iv) Jang to Lumla and (v) Lumla to Neliya (border) in the
Technical Evaluation Result for Installation of Fencing of length 6.6 km (both sides) under Flyover in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022-23. Dated : 13-04-2023. Read more about Technical Evaluation Result for Installation of Fencing of length 6.6 km (both sides) under Flyover in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022-23. Dated : 13-04-2023.