Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177+372 km (Design Ch.139+750 km to Ch.173+434 km) for Package-9 of Bilasipura- Guwahati road (NH 17) (Section: Dhupdhara Sahar to Milmila Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177+372 km (Design Ch.139+750 km to Ch.173+434 km) for Package-9 of Bilasipura- Guwahati road (NH 17) (Section: Dhupdhara Sahar to Milmila
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage km 9.450 to km 50.850 (Package-2) in the State of Manipur on EPC mode. Dated : 10-03-2023. Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage km 9.450 to km 50.850 (Package-2) in the State of Manipur on EPC mode. Dated : 10-03-2023.
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Construction of 2-lane with paved shoulders of Aizawl Bypass from km 0.000 to km 10.600 (Package-1) and km 15.200 to km 34.500 (Package-3) on Sairang-Phaibawk Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Construction of 2-lane with paved shoulders of Aizawl Bypass from km 0.000 to km 10.600 (Package-1) and km 15.200 to km 34.500 (Package-3) on Sairang-Phaibawk
Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S Read more about Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S
Technical Evaluation Result for Construction of Four Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village in the St Read more about Technical Evaluation Result for Construction of Four Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village in the St
Technical Evaluation Result for Construction of 2-lane Aizawl Bypass from km 0.000 to km 10.600 (Package-1) on Sairang – Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode. Dated : 07-03-2023. Read more about Technical Evaluation Result for Construction of 2-lane Aizawl Bypass from km 0.000 to km 10.600 (Package-1) on Sairang – Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode. Dated : 07-03-2023.
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated : 06-03 Read more about Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated : 06-03
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF “Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam.”. Dated : 03-03-2023. Read more about Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF “Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam.”. Dated : 03-03-2023.
Technical Evaluation Result for Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 (Package-3) on Sairang – Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode. Dated : 03-03-2023. Read more about Technical Evaluation Result for Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 (Package-3) on Sairang – Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode. Dated : 03-03-2023.
Technical Evaluation Result for Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting from NH-06 near Ladumsaw (Existing km 60.900 of old NH-40) to NH106 (old NH-44E), km 0+000 to km 12+800 (Package-I) under SARDP-NE ‘PHASE A’ i Read more about Technical Evaluation Result for Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting from NH-06 near Ladumsaw (Existing km 60.900 of old NH-40) to NH106 (old NH-44E), km 0+000 to km 12+800 (Package-I) under SARDP-NE ‘PHASE A’ i