Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA- BYPASS ROAD CONNECTING NH-39 (NEW NH-02), NH-150(NEW NH-02), NH- 61(NEW NH-29) AND NH-39 (NEW NH-02) FROM DESIGN KM 0.00 TO DESIGN KM 10.500 [DESIGN LENGTH – 10.500 K Read more about Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA- BYPASS ROAD CONNECTING NH-39 (NEW NH-02), NH-150(NEW NH-02), NH- 61(NEW NH-29) AND NH-39 (NEW NH-02) FROM DESIGN KM 0.00 TO DESIGN KM 10.500 [DESIGN LENGTH – 10.500 K
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukhia -Makum Bypass of NH-15 (OLD NH-37) and Strengthening of existing NH-315 (OLD NH Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukhia -Makum Bypass of NH-15 (OLD NH-37) and Strengthening of existing NH-315 (OLD NH
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 169.570 km to 205.974 Km (PKG-7) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated : Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 169.570 km to 205.974 Km (PKG-7) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated :
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specific Read more about Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specific
Technical Evaluation Result for Restoration & Rehabilitation of NH-02 of Imphal-Kohima Road from existing chainage Km 287.00 to Km 299.60 [Total Length = 12.60 Km] in the state of Manipur in the FY 2022-23 on Item Rate mode. Dated : 05-12-2022. Read more about Technical Evaluation Result for Restoration & Rehabilitation of NH-02 of Imphal-Kohima Road from existing chainage Km 287.00 to Km 299.60 [Total Length = 12.60 Km] in the state of Manipur in the FY 2022-23 on Item Rate mode. Dated : 05-12-2022.
Technical Evaluation Result for Installation of View Cutters on elevated structure near BSF Campus in village Paloura from Km. 3+430 to Km. 4+930 for a length of 1.50 km in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022- Read more about Technical Evaluation Result for Installation of View Cutters on elevated structure near BSF Campus in village Paloura from Km. 3+430 to Km. 4+930 for a length of 1.50 km in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022-
Technical Evaluation Result for Snow Clearance from km 143.00 to km 235.00 on Batote-KishtwarChatroo-Sinthanpass-Khanabal road of NH-244, to make road stretch traffic worthy during winter season, in the UT of Jammu & Kashmir, for a period of 5 years (2nd Read more about Technical Evaluation Result for Snow Clearance from km 143.00 to km 235.00 on Batote-KishtwarChatroo-Sinthanpass-Khanabal road of NH-244, to make road stretch traffic worthy during winter season, in the UT of Jammu & Kashmir, for a period of 5 years (2nd
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated : 18-11-2022. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated : 18-11-2022.
Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated : 18-11-2022. Read more about Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated : 18-11-2022.
Technical Evaluation Result for “Restoration and Repair of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis) – 2nd Call. D Read more about Technical Evaluation Result for “Restoration and Repair of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis) – 2nd Call. D