Technical Evaluation Result for empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 24-01-2023. Read more about Technical Evaluation Result for empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 24-01-2023.
Technical Evaluation Result for WIDENING TO 2 (TWO) LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+975 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE. Dated : 17-01-2023. Read more about Technical Evaluation Result for WIDENING TO 2 (TWO) LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+975 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE. Dated : 17-01-2023.
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023. Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023.
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-III (Design Chainage 69+875 Km to 106+816 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023. Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-III (Design Chainage 69+875 Km to 106+816 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023.
Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA BYPASS ROAD CONNECTING NH-39 (NEWNH-02),NH-150 (NEW NH-02), NH-61(NEW NH-29) AND NH-39 (NEWNH-02) FROM DESIGN KM21.000 TO DESIGN KM 32.268 [DESIGN LENGTH 11.268 KM IN T Read more about Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA BYPASS ROAD CONNECTING NH-39 (NEWNH-02),NH-150 (NEW NH-02), NH-61(NEW NH-29) AND NH-39 (NEWNH-02) FROM DESIGN KM21.000 TO DESIGN KM 32.268 [DESIGN LENGTH 11.268 KM IN T
Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA- BYPASS ROAD CONNECTING NH-39 (NEW NH-02), NH-150(NEW NH-02), NH- 61(NEW NH-29) AND NH-39 (NEW NH-02) FROM DESIGN KM 0.00 TO DESIGN KM 10.500 [DESIGN LENGTH – 10.500 K Read more about Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA- BYPASS ROAD CONNECTING NH-39 (NEW NH-02), NH-150(NEW NH-02), NH- 61(NEW NH-29) AND NH-39 (NEW NH-02) FROM DESIGN KM 0.00 TO DESIGN KM 10.500 [DESIGN LENGTH – 10.500 K
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukhia -Makum Bypass of NH-15 (OLD NH-37) and Strengthening of existing NH-315 (OLD NH Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukhia -Makum Bypass of NH-15 (OLD NH-37) and Strengthening of existing NH-315 (OLD NH
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 169.570 km to 205.974 Km (PKG-7) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated : Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 169.570 km to 205.974 Km (PKG-7) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated :
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specific Read more about Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specific
Technical Evaluation Result for Restoration & Rehabilitation of NH-02 of Imphal-Kohima Road from existing chainage Km 287.00 to Km 299.60 [Total Length = 12.60 Km] in the state of Manipur in the FY 2022-23 on Item Rate mode. Dated : 05-12-2022. Read more about Technical Evaluation Result for Restoration & Rehabilitation of NH-02 of Imphal-Kohima Road from existing chainage Km 287.00 to Km 299.60 [Total Length = 12.60 Km] in the state of Manipur in the FY 2022-23 on Item Rate mode. Dated : 05-12-2022.