Technical Evaluation Result for Restoration & Rehabilitation of NH-02 of Imphal-Kohima Road from existing chainage Km 287.00 to Km 299.60 [Total Length = 12.60 Km] in the state of Manipur in the FY 2022-23 on Item Rate mode. Dated : 05-12-2022. Read more about Technical Evaluation Result for Restoration & Rehabilitation of NH-02 of Imphal-Kohima Road from existing chainage Km 287.00 to Km 299.60 [Total Length = 12.60 Km] in the state of Manipur in the FY 2022-23 on Item Rate mode. Dated : 05-12-2022.
Technical Evaluation Result for Installation of View Cutters on elevated structure near BSF Campus in village Paloura from Km. 3+430 to Km. 4+930 for a length of 1.50 km in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022- Read more about Technical Evaluation Result for Installation of View Cutters on elevated structure near BSF Campus in village Paloura from Km. 3+430 to Km. 4+930 for a length of 1.50 km in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022-
Technical Evaluation Result for Snow Clearance from km 143.00 to km 235.00 on Batote-KishtwarChatroo-Sinthanpass-Khanabal road of NH-244, to make road stretch traffic worthy during winter season, in the UT of Jammu & Kashmir, for a period of 5 years (2nd Read more about Technical Evaluation Result for Snow Clearance from km 143.00 to km 235.00 on Batote-KishtwarChatroo-Sinthanpass-Khanabal road of NH-244, to make road stretch traffic worthy during winter season, in the UT of Jammu & Kashmir, for a period of 5 years (2nd
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated : 18-11-2022. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated : 18-11-2022.
Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated : 18-11-2022. Read more about Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated : 18-11-2022.
Technical Evaluation Result for “Restoration and Repair of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis) – 2nd Call. D Read more about Technical Evaluation Result for “Restoration and Repair of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis) – 2nd Call. D
Technical Evaluation Result for Upgradation of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km 26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman Chowk) including bridge on Chenab river Read more about Technical Evaluation Result for Upgradation of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km 26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman Chowk) including bridge on Chenab river
Technical Evaluation Result for CONSTRUCTION/ UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 2.000 TO KM 16.167 (BALANCE WORK) OF NH-717-A ON EPC BASIS UNDER SARDP-NE PHASE-A IN Read more about Technical Evaluation Result for CONSTRUCTION/ UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 2.000 TO KM 16.167 (BALANCE WORK) OF NH-717-A ON EPC BASIS UNDER SARDP-NE PHASE-A IN
Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. (2nd Call). Dated : 19-10- Read more about Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. (2nd Call). Dated : 19-10-
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A”