Technical Evaluation Result for Improvement and Widening of National Highway No. 127B (Darugiri – Songsak – Williamnagar Junction Section) to two lane with paved shoulder from design Km 0+000 to Km 36+635 (Design Length= 36.635 Km) (existing Km 112+000 to Read more about Technical Evaluation Result for Improvement and Widening of National Highway No. 127B (Darugiri – Songsak – Williamnagar Junction Section) to two lane with paved shoulder from design Km 0+000 to Km 36+635 (Design Length= 36.635 Km) (existing Km 112+000 to
Technical Evaluation Result for Improvement/Widening of National Highway No. 217 (Dainadubi-Darugiri Section) to Two lane with paved shoulder in the state of Meghalaya, from design Km 0+000 to Km 40+840 (Design Length= 40.840 Km) (existing Km 8+600 to Km Read more about Technical Evaluation Result for Improvement/Widening of National Highway No. 217 (Dainadubi-Darugiri Section) to Two lane with paved shoulder in the state of Meghalaya, from design Km 0+000 to Km 40+840 (Design Length= 40.840 Km) (existing Km 8+600 to Km
Technical Evaluation Result for Four laning of Sethawn – N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under B Read more about Technical Evaluation Result for Four laning of Sethawn – N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under B
Technical Evaluation Result for Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 20+000) on Silchar – Vairengte – Sairang road in the State of Assam un Read more about Technical Evaluation Result for Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 20+000) on Silchar – Vairengte – Sairang road in the State of Assam un
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I (Design Chainage 0+000 Km to 34+975 Km) in the State of Nagaland on EPC mode under NH (O)-NE.. Dated : 15-03-2023. Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I (Design Chainage 0+000 Km to 34+975 Km) in the State of Nagaland on EPC mode under NH (O)-NE.. Dated : 15-03-2023.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177+372 km (Design Ch.139+750 km to Ch.173+434 km) for Package-9 of Bilasipura- Guwahati road (NH 17) (Section: Dhupdhara Sahar to Milmila Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177+372 km (Design Ch.139+750 km to Ch.173+434 km) for Package-9 of Bilasipura- Guwahati road (NH 17) (Section: Dhupdhara Sahar to Milmila
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage km 9.450 to km 50.850 (Package-2) in the State of Manipur on EPC mode. Dated : 10-03-2023. Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage km 9.450 to km 50.850 (Package-2) in the State of Manipur on EPC mode. Dated : 10-03-2023.
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Construction of 2-lane with paved shoulders of Aizawl Bypass from km 0.000 to km 10.600 (Package-1) and km 15.200 to km 34.500 (Package-3) on Sairang-Phaibawk Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Construction of 2-lane with paved shoulders of Aizawl Bypass from km 0.000 to km 10.600 (Package-1) and km 15.200 to km 34.500 (Package-3) on Sairang-Phaibawk
Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S Read more about Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S
Technical Evaluation Result for Construction of Four Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village in the St Read more about Technical Evaluation Result for Construction of Four Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village in the St