Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Result of Technical Evaluation for Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram

  • Read more about Result of Technical Evaluation for Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram

Technical Evaluation Result for the work Balance work of 4-laning of Dimapur -Kohima Road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to 172.900) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an Engineeri

  • Read more about Technical Evaluation Result for the work Balance work of 4-laning of Dimapur -Kohima Road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to 172.900) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an Engineeri

Technical Evaluation Result for the work Consultancy Services for Authority’s Engineer for supervision of Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam.

  • Read more about Technical Evaluation Result for the work Consultancy Services for Authority’s Engineer for supervision of Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam.

Technical Evaluation Result for the work Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect of the following : (i) Up-gradation to 2/4/6 lane from km 343 (Kumarghat) to km 397 (Ambassa) and f

  • Read more about Technical Evaluation Result for the work Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect of the following : (i) Up-gradation to 2/4/6 lane from km 343 (Kumarghat) to km 397 (Ambassa) and f

Technical Evaluation Result for the work of Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930

  • Read more about Technical Evaluation Result for the work of Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services from –(i) Silchar ISBT (Start point of Silchar Bypass) to junction of NH-37 & NH-6 at Dhaleshwari, (ii) End of proposed

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services from –(i) Silchar ISBT (Start point of Silchar Bypass) to junction of NH-37 & NH-6 at Dhaleshwari, (ii) End of proposed

Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o

  • Read more about Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o

Technical Evaluation Result for Balance work of 4-laning of Dimapur -Kohima Road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to 172.900) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an Engineering, Procu

  • Read more about Technical Evaluation Result for Balance work of 4-laning of Dimapur -Kohima Road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to 172.900) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an Engineering, Procu

Technical Evaluation Result for Balance work of Construction of two-lane with hard Shoulders of Merangkong-Tamlu-Mon road (Wakching- Town Portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km 59+000 to Km 72+450] (Design Length-13.450 Km)

  • Read more about Technical Evaluation Result for Balance work of Construction of two-lane with hard Shoulders of Merangkong-Tamlu-Mon road (Wakching- Town Portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km 59+000 to Km 72+450] (Design Length-13.450 Km)

Technical Evaluation Result for Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total leng

  • Read more about Technical Evaluation Result for Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total leng

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 15
  • Page 16
  • Page 17
  • Page 18
  • Current page 19
  • Page 20
  • Page 21
  • Page 22
  • Page 23
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 08/09/2025