Technical Evaluation Result for Balance work for 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated : 04-05 Read more about Technical Evaluation Result for Balance work for 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated : 04-05
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “2- laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 02-05-2023. Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “2- laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 02-05-2023.
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930km to Ch.143+680 km (Design Ch.96+000km to Ch.139+750km) for Package-8 of BilasipuraG Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930km to Ch.143+680 km (Design Ch.96+000km to Ch.139+750km) for Package-8 of BilasipuraG
Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches (i) Seijosa to Pakke kessang (ii) Seppa to Chayangtajo (iii) Kamenbari to Tenga (iv) Jang to Lumla and (v) Lumla to Neliya (border) in the Read more about Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches (i) Seijosa to Pakke kessang (ii) Seppa to Chayangtajo (iii) Kamenbari to Tenga (iv) Jang to Lumla and (v) Lumla to Neliya (border) in the
Technical Evaluation Result for Installation of Fencing of length 6.6 km (both sides) under Flyover in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022-23. Dated : 13-04-2023. Read more about Technical Evaluation Result for Installation of Fencing of length 6.6 km (both sides) under Flyover in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022-23. Dated : 13-04-2023.
Technical Evaluation Result for Widening/Improvement to 2 (Two) lane with earthen shoulder of Marrem Khullen to Jessami section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 95.700 to km 140.180 (Package-6) in the State Read more about Technical Evaluation Result for Widening/Improvement to 2 (Two) lane with earthen shoulder of Marrem Khullen to Jessami section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 95.700 to km 140.180 (Package-6) in the State
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 136.500 near Hejaichak to km 156.489 near P. Leikul (Package-9) on EPC mode. Dated : 29- Read more about Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 136.500 near Hejaichak to km 156.489 near P. Leikul (Package-9) on EPC mode. Dated : 29-
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.177+372 km to Ch. 203+783 km (Design Ch.173+434km to Ch.200+750km) for Package-10 of Bilasipura- Guwahati road (NH 17) (Section: Milmila R.F (before Chayagao Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.177+372 km to Ch. 203+783 km (Design Ch.173+434km to Ch.200+750km) for Package-10 of Bilasipura- Guwahati road (NH 17) (Section: Milmila R.F (before Chayagao
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 55+000 (Nagabang Gamsuk) to km 82+514 (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode (Package-3) under Bharatmala Pariyojna of length 27.524 Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 55+000 (Nagabang Gamsuk) to km 82+514 (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode (Package-3) under Bharatmala Pariyojna of length 27.524
Technical Evaluation Result for Four laning of Dhanehari – Lailapur / Vairengte section (Package-2) from Existing Chainage km 12+920 to km 43+000 of NH 306 (Design Chainage km 20+000 to km 49+360) on Silchar – Vairengte – Sairang road in the State of Assa Read more about Technical Evaluation Result for Four laning of Dhanehari – Lailapur / Vairengte section (Package-2) from Existing Chainage km 12+920 to km 43+000 of NH 306 (Design Chainage km 20+000 to km 49+360) on Silchar – Vairengte – Sairang road in the State of Assa