Technical Evaluation Result for Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 53.110 to km 95.700 (Package-5) in the State Read more about Technical Evaluation Result for Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 53.110 to km 95.700 (Package-5) in the State
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 27+701 (Simen Chapori) to km 55+000 (Nagabang Gamsuk) in the State of Assam on EPC mode (Package-2). Dated : 27-03-2023. Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 27+701 (Simen Chapori) to km 55+000 (Nagabang Gamsuk) in the State of Assam on EPC mode (Package-2). Dated : 27-03-2023.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) in the State of Assam on EPC mode (Package-1). Dated : 27-03-2023. Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) in the State of Assam on EPC mode (Package-1). Dated : 27-03-2023.
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 156.489 near P. Leikul to km 176.581 near Borowapu (Package-10) on EPC mode. Dated : 27- Read more about Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 156.489 near P. Leikul to km 176.581 near Borowapu (Package-10) on EPC mode. Dated : 27-
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 116.480 near Hangrum to km 136.500 near Hejaichak (Package-8) on EPC mode under NH(O) Read more about Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 116.480 near Hangrum to km 136.500 near Hejaichak (Package-8) on EPC mode under NH(O)
Technical Evaluation Result for Annual Maintenance Work on NH-717A ( Km 61.100 Lava More to Km. 76.350 Algarah Bypass) under jurisdiction of PMU Kalimpong, NHIDCL in the state of West Bengal on Item Rate Contract Basis for FY 2022-23. Dated : 27-03-2023. Read more about Technical Evaluation Result for Annual Maintenance Work on NH-717A ( Km 61.100 Lava More to Km. 76.350 Algarah Bypass) under jurisdiction of PMU Kalimpong, NHIDCL in the state of West Bengal on Item Rate Contract Basis for FY 2022-23. Dated : 27-03-2023.
Technical Evaluation Result for Widening/Improvement to 2 (Two) Lane with earthen shoulder of Jessami to Laynen bridge (Nagaland border) section of NH-29 of Imphal – Ukhrul – Jessami Economic Corridor from km 0.000 to km 11.009 (Package-7) in the state of Read more about Technical Evaluation Result for Widening/Improvement to 2 (Two) Lane with earthen shoulder of Jessami to Laynen bridge (Nagaland border) section of NH-29 of Imphal – Ukhrul – Jessami Economic Corridor from km 0.000 to km 11.009 (Package-7) in the state of
Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total length 36.000 Km) on Teliamura to Harina section of NH 208 (Package –III) in the st Read more about Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total length 36.000 Km) on Teliamura to Harina section of NH 208 (Package –III) in the st
Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km 36.00 (ne Read more about Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km 36.00 (ne
Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 27+150 (Golai Goan) to km 47+682 (Ledo) on Dibrugarh to Ledo section with proposed Margherita & Ledo Bypass (Brownfield and Green Field) (2-Lane+PS) of NH-38 i Read more about Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 27+150 (Golai Goan) to km 47+682 (Ledo) on Dibrugarh to Ledo section with proposed Margherita & Ledo Bypass (Brownfield and Green Field) (2-Lane+PS) of NH-38 i