Technical Evaluation Result for Annual Maintenance Work on NH-717A ( Km 61.100 Lava More to Km. 76.350 Algarah Bypass) under jurisdiction of PMU Kalimpong, NHIDCL in the state of West Bengal on Item Rate Contract Basis for FY 2022-23. Dated : 27-03-2023. Read more about Technical Evaluation Result for Annual Maintenance Work on NH-717A ( Km 61.100 Lava More to Km. 76.350 Algarah Bypass) under jurisdiction of PMU Kalimpong, NHIDCL in the state of West Bengal on Item Rate Contract Basis for FY 2022-23. Dated : 27-03-2023.
Technical Evaluation Result for Widening/Improvement to 2 (Two) Lane with earthen shoulder of Jessami to Laynen bridge (Nagaland border) section of NH-29 of Imphal – Ukhrul – Jessami Economic Corridor from km 0.000 to km 11.009 (Package-7) in the state of Read more about Technical Evaluation Result for Widening/Improvement to 2 (Two) Lane with earthen shoulder of Jessami to Laynen bridge (Nagaland border) section of NH-29 of Imphal – Ukhrul – Jessami Economic Corridor from km 0.000 to km 11.009 (Package-7) in the state of
Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total length 36.000 Km) on Teliamura to Harina section of NH 208 (Package –III) in the st Read more about Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total length 36.000 Km) on Teliamura to Harina section of NH 208 (Package –III) in the st
Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km 36.00 (ne Read more about Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km 36.00 (ne
Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 27+150 (Golai Goan) to km 47+682 (Ledo) on Dibrugarh to Ledo section with proposed Margherita & Ledo Bypass (Brownfield and Green Field) (2-Lane+PS) of NH-38 i Read more about Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 27+150 (Golai Goan) to km 47+682 (Ledo) on Dibrugarh to Ledo section with proposed Margherita & Ledo Bypass (Brownfield and Green Field) (2-Lane+PS) of NH-38 i
Technical Evaluation Result for Widening & Improvement to 2-lane with Paved shoulder configuration of Dudhnoi – Dainadubi section (NH-217) under Bharatmala Pariyojana from design km 0+000 to km 8+415 (existing km 0+000 to km 8+600 of Old NH-62) in the Sta Read more about Technical Evaluation Result for Widening & Improvement to 2-lane with Paved shoulder configuration of Dudhnoi – Dainadubi section (NH-217) under Bharatmala Pariyojana from design km 0+000 to km 8+415 (existing km 0+000 to km 8+600 of Old NH-62) in the Sta
Technical Evaluation Result for Construction of four lane with paved shoulder Agartala bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in the state of Tripura on EPC basis. Dated : 22-03-2023. Read more about Technical Evaluation Result for Construction of four lane with paved shoulder Agartala bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in the state of Tripura on EPC basis. Dated : 22-03-2023.
Technical Evaluation Result for Construction of 2/4 lane with paved shoulder of Shillong Western Bypass starting from NH-06 near Ladumsaw (existing km 60.900 of old NH-40) to NH-106 (old NH-44E), (Package-II) km 12+800 to km 24+700 under SARDP-NE ‘Phase A Read more about Technical Evaluation Result for Construction of 2/4 lane with paved shoulder of Shillong Western Bypass starting from NH-06 near Ladumsaw (existing km 60.900 of old NH-40) to NH-106 (old NH-44E), (Package-II) km 12+800 to km 24+700 under SARDP-NE ‘Phase A
Technical Evaluation Result for Construction of 2/4 lane with paved shoulders of Shillong Western Bypass starting from NH-06 near Ladumsaw (existing Km 60.900 of old NH40) to NH106 (old NH 44E) (Package-III), from km 24+700 to km 38+256 under SARDP-NE PHA Read more about Technical Evaluation Result for Construction of 2/4 lane with paved shoulders of Shillong Western Bypass starting from NH-06 near Ladumsaw (existing Km 60.900 of old NH40) to NH106 (old NH 44E) (Package-III), from km 24+700 to km 38+256 under SARDP-NE PHA
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Pa Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Pa