Technical Evaluation Result for Consultancy services for Authority’s Engineer for the following projects: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in ii) the State of Assam starting from km 136.500 Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for the following projects: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in ii) the State of Assam starting from km 136.500
Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of Construction of four lane with paved shoulder Agartala bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in t Read more about Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of Construction of four lane with paved shoulder Agartala bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in t
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configu Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configu
RFP for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of Nagaland on EPC mode unde Read more about RFP for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of Nagaland on EPC mode unde
RFP for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim, Uttarakhand, Himachal Pradesh & UT of Ladakh in high altitude remote areas on lumpsum mode Read more about RFP for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim, Uttarakhand, Himachal Pradesh & UT of Ladakh in high altitude remote areas on lumpsum mode
Technical Evaluation Result for Consultancy services for authority’s engineer for supervision of: (i) Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km Read more about Technical Evaluation Result for Consultancy services for authority’s engineer for supervision of: (i) Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km
Technical Evaluation Result Consultancy Services for preparation of Detailed Project Report for up-gradation of existing single road to 2-lane configuration from Churachandpur to Tipaimukh Section of NH-02 in the State of Manipur Read more about Technical Evaluation Result Consultancy Services for preparation of Detailed Project Report for up-gradation of existing single road to 2-lane configuration from Churachandpur to Tipaimukh Section of NH-02 in the State of Manipur
Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim, Uttarakhand, Himachal Pradesh & UT of Ladakh in high altitude remote areas on lumpsum mode. Read more about Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim, Uttarakhand, Himachal Pradesh & UT of Ladakh in high altitude remote areas on lumpsum mode.
Technical Evaluation Result for the work Restoration & Periodical Repairs by way of clearance of landslides, surface boulders, side drain and culverts including construction of R/walls and B/walls and laying of Bituminous Carpeting of NH-244, on Chatroo-S Read more about Technical Evaluation Result for the work Restoration & Periodical Repairs by way of clearance of landslides, surface boulders, side drain and culverts including construction of R/walls and B/walls and laying of Bituminous Carpeting of NH-244, on Chatroo-S
Technical Evaluation Result for the work Restoration & Periodical Repairs by way of clearance of landslides, surface boulders, side drain and culverts including construction of R/walls and B/walls and laying of Bituminous Carpeting of NH-244, on Chatroo-S Read more about Technical Evaluation Result for the work Restoration & Periodical Repairs by way of clearance of landslides, surface boulders, side drain and culverts including construction of R/walls and B/walls and laying of Bituminous Carpeting of NH-244, on Chatroo-S