Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177.372 Km (Design Ch. 139.750km to Ch. 173.434km) for Package-9 of Bi

  • Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177.372 Km (Design Ch. 139.750km to Ch. 173.434km) for Package-9 of Bi

Technical Evaluation Result of Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnel and its approach roads (from D.Ch. 0.00 to D Ch. 12.85) on Chenani – Sudhmahadev – Goha Ro

  • Read more about Technical Evaluation Result of Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnel and its approach roads (from D.Ch. 0.00 to D Ch. 12.85) on Chenani – Sudhmahadev – Goha Ro

Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report and for pre-construction activities towards Construction of 4-lane Tunnel Connectivity across river Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH

  • Read more about Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report and for pre-construction activities towards Construction of 4-lane Tunnel Connectivity across river Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for connecting National Waterway – 2 at Dhubri to NH- 127B in the State of Assam. – (3rd Call)

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for connecting National Waterway – 2 at Dhubri to NH- 127B in the State of Assam. – (3rd Call)

Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni Directional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev Goha-Khellani-

  • Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni Directional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev Goha-Khellani-

Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 10+670 to km 37+550) design length of 26.550 km in the State

  • Read more about Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 10+670 to km 37+550) design length of 26.550 km in the State

Technical Evaluation Result Consultancy services for Authority’s Engineer for supervision of: (i) Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at cr

  • Read more about Technical Evaluation Result Consultancy services for Authority’s Engineer for supervision of: (i) Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at cr

Technical Evaluation Result for Balance Work for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road up to Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99

  • Read more about Technical Evaluation Result for Balance Work for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road up to Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99

Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukia -Makum Bypass of NH-15 (Old NH 37) and Impro

  • Read more about Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukia -Makum Bypass of NH-15 (Old NH 37) and Impro

Technical Evaluation Result RFP for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Udaipur in the State of Tripura under PM Gati Shakti

  • Read more about Technical Evaluation Result RFP for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Udaipur in the State of Tripura under PM Gati Shakti

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 12
  • Page 13
  • Page 14
  • Page 15
  • Current page 16
  • Page 17
  • Page 18
  • Page 19
  • Page 20
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 06/09/2025

  • Total Visitors: 127682