Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Detailed Project Report for Construction of ‘Tungri-Mathow-Dubbin-Dishing-Debrik’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length: 84.00 Km) ( Package-I)

  • Read more about Technical Evaluation Result for Detailed Project Report for Construction of ‘Tungri-Mathow-Dubbin-Dishing-Debrik’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length: 84.00 Km) ( Package-I)

Technical Evaluation Result for Improvement/ Widening to 2-lane with paved shoulder/4-laning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki bridge from km 131+820 to km 151+330 (design km 45+760 to km 63+530) Design length

  • Read more about Technical Evaluation Result for Improvement/ Widening to 2-lane with paved shoulder/4-laning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki bridge from km 131+820 to km 151+330 (design km 45+760 to km 63+530) Design length

Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnel and its approach roads (from D.Ch. 0.00 to D Ch. 12.85) on Chenani – Sudhmahadev – Goha

  • Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnel and its approach roads (from D.Ch. 0.00 to D Ch. 12.85) on Chenani – Sudhmahadev – Goha

Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of Construction of UniDirectional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev Goha-Khellani-K

  • Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of Construction of UniDirectional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev Goha-Khellani-K

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Tuting-(Kunging) Kahebingo-Taphuk, Jorging–DBGG-2590 & DBGG – Nape,’ Road Approved under ICBR (PH-III)Project in the State of Arunachal Pr

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Tuting-(Kunging) Kahebingo-Taphuk, Jorging–DBGG-2590 & DBGG – Nape,’ Road Approved under ICBR (PH-III)Project in the State of Arunachal Pr

Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Packa

  • Read more about Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Packa

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of following greenfield projects: (i) Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting From near Ladumsaw (Existing km 60.900 of

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of following greenfield projects: (i) Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting From near Ladumsaw (Existing km 60.900 of

Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 67.990) of total length 2.755 km excluding Tidding Bridge (155 m) in t

  • Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 67.990) of total length 2.755 km excluding Tidding Bridge (155 m) in t

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Tuting-(Kunging) Kahebingo-Taphuk, Jorging–DBGG-2590 & DBGG – Nape,’ Road Approved under ICBR (PH-III)Project in the State of Arunachal Pr

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Tuting-(Kunging) Kahebingo-Taphuk, Jorging–DBGG-2590 & DBGG – Nape,’ Road Approved under ICBR (PH-III)Project in the State of Arunachal Pr

Technical Evaluation Result Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Tungri – Mathow – Dubbin – Dishing – Debrik’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length: 84.00

  • Read more about Technical Evaluation Result Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Tungri – Mathow – Dubbin – Dishing – Debrik’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length: 84.00

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 9
  • Page 10
  • Page 11
  • Page 12
  • Current page 13
  • Page 14
  • Page 15
  • Page 16
  • Page 17
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 06/09/2025