Consultancy Services for Preparation of Detailed Project Report for Slope Protection and Slope Stabilization works including Rockfall Protection and Landslide Mitigation measures from km 123.840 to km 166.700 of NH-29 on 4-laning of Dimapur-Kohima Road un Read more about Consultancy Services for Preparation of Detailed Project Report for Slope Protection and Slope Stabilization works including Rockfall Protection and Landslide Mitigation measures from km 123.840 to km 166.700 of NH-29 on 4-laning of Dimapur-Kohima Road un
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – Read more about CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg –
Expression of Interest (EOI) for short listing of Consultants for Authority’s Engineer JICA ODA Phase-VI in the state of Tripura Read more about Expression of Interest (EOI) for short listing of Consultants for Authority’s Engineer JICA ODA Phase-VI in the state of Tripura
Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km (263+070) Donipawa of 8.643 Read more about Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km (263+070) Donipawa of 8.643
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of 2nd Tube Uni-directional Zojila Tunnel (13.14 km) from D.ch. 16.80 to D.Ch. 30.50 of NH-1 in the under UT of Ja Read more about Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of 2nd Tube Uni-directional Zojila Tunnel (13.14 km) from D.ch. 16.80 to D.Ch. 30.50 of NH-1 in the under UT of Ja
Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-IV: Structures & Toll Plaza, under SARDP- NE, under EPC Mode – Result of Technical Evaluation Read more about Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-IV: Structures & Toll Plaza, under SARDP- NE, under EPC Mode – Result of Technical Evaluation
Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-III: Road Works from Km 514+800 to Km 534+800 (20.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation Read more about Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-III: Road Works from Km 514+800 to Km 534+800 (20.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation
Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-II: Road Works from Km 501+800 to Km 514+800 (13.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation Read more about Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-II: Road Works from Km 501+800 to Km 514+800 (13.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation
Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-I: Road Works from Km 490+800 to Km 501+800 (11.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation Read more about Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-I: Road Works from Km 490+800 to Km 501+800 (11.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation
Result of Technical Evaluation for Construction of Major bridge at Design Ch. 28+200 of Hunli-Anini Road (NH-313) in the State of Arunachal Pradesh on EPC Mode under SARDP(2nd Call) Read more about Result of Technical Evaluation for Construction of Major bridge at Design Ch. 28+200 of Hunli-Anini Road (NH-313) in the State of Arunachal Pradesh on EPC Mode under SARDP(2nd Call)