Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km Read more about Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km
Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the state of Read more about Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the state of
Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Constructi Read more about Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Constructi
Construction of Balance Work of the 4- laning of Jamugurihat to end of Biswanath Chariali Bypass of NH- 15 from Km 182.000 to Km 208.000 (26 Km), under SARDP-NE, under EPC Mode at the Risk and Cost of EPC Contractor Read more about Construction of Balance Work of the 4- laning of Jamugurihat to end of Biswanath Chariali Bypass of NH- 15 from Km 182.000 to Km 208.000 (26 Km), under SARDP-NE, under EPC Mode at the Risk and Cost of EPC Contractor
Short Term Maintenance Contract of Peren-Dimapur Section on NH-129A from existing Km 120+500 to Km 123+380 [Design Km 120+320 to Km 123+200 (Length 2.88 Km)] in the state of Nagaland in FY: 2024-25- 4th Call Read more about Short Term Maintenance Contract of Peren-Dimapur Section on NH-129A from existing Km 120+500 to Km 123+380 [Design Km 120+320 to Km 123+200 (Length 2.88 Km)] in the state of Nagaland in FY: 2024-25- 4th Call
Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Pkg-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram Read more about Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Pkg-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram
Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis Read more about Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis
Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Constructi Read more about Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Constructi
Short Term Maintenance Contract for Scaling of Hill Slope and Installation of Rock Fall Barrier in Pagla-Pahar, Dimapur Kohima road (PKG-I) from Km. 123.840 to 127.480 in the state of Nagaland in FY: 2024-25 (Percentage Rate and work Order Basis Read more about Short Term Maintenance Contract for Scaling of Hill Slope and Installation of Rock Fall Barrier in Pagla-Pahar, Dimapur Kohima road (PKG-I) from Km. 123.840 to 127.480 in the state of Nagaland in FY: 2024-25 (Percentage Rate and work Order Basis
Consultancy services for Authority’s Engineer for Supervision of Widening/Improvemenagt to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Packe 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km Read more about Consultancy services for Authority’s Engineer for Supervision of Widening/Improvemenagt to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Packe 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km