Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis

  • Read more about Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis

Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Constructi

  • Read more about Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Constructi

Short Term Maintenance Contract for Scaling of Hill Slope and Installation of Rock Fall Barrier in Pagla-Pahar, Dimapur Kohima road (PKG-I) from Km. 123.840 to 127.480 in the state of Nagaland in FY: 2024-25 (Percentage Rate and work Order Basis

  • Read more about Short Term Maintenance Contract for Scaling of Hill Slope and Installation of Rock Fall Barrier in Pagla-Pahar, Dimapur Kohima road (PKG-I) from Km. 123.840 to 127.480 in the state of Nagaland in FY: 2024-25 (Percentage Rate and work Order Basis

Consultancy services for Authority’s Engineer for Supervision of Widening/Improvemenagt to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Packe 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km

  • Read more about Consultancy services for Authority’s Engineer for Supervision of Widening/Improvemenagt to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Packe 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km

Consultancy Services as Authority’s Engineer for Supervision of: i) Ukhrul bypass on NH-102A (Package-1, Length-6.571 km) ii) Finch Corner to Ukhrul section of NH-202 (Package-3, Length-14.63 km) & iii) Ukhrul to Choithar section of NH-202 (Package-4, Len

  • Read more about Consultancy Services as Authority’s Engineer for Supervision of: i) Ukhrul bypass on NH-102A (Package-1, Length-6.571 km) ii) Finch Corner to Ukhrul section of NH-202 (Package-3, Length-14.63 km) & iii) Ukhrul to Choithar section of NH-202 (Package-4, Len

Consultancy Services as Authority’s Engineer for Supervision of :- (i) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 46+704(Total length:46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) in the State of

  • Read more about Consultancy Services as Authority’s Engineer for Supervision of :- (i) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 46+704(Total length:46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) in the State of

Consultancy services for Authority’s Engineer for Supervision of following greenfield projects: (i) Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting from near Ladumsaw (Existing km 60.900 of NH-40) to NH- 106 (OLD NH-44E),

  • Read more about Consultancy services for Authority’s Engineer for Supervision of following greenfield projects: (i) Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting from near Ladumsaw (Existing km 60.900 of NH-40) to NH- 106 (OLD NH-44E),

Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg- IV: Structures & Toll Plaza under SARDP- NE , under EPC Mode in the state of Assam.

  • Read more about Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg- IV: Structures & Toll Plaza under SARDP- NE , under EPC Mode in the state of Assam.

Balance work for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-I) of Srirampur – Dhubri Section of NH-127B from e

  • Read more about Balance work for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-I) of Srirampur – Dhubri Section of NH-127B from e

Short Term Maintenance Contract of Dimapur-Kohima Section on NH-29 from old chainage Km 134.650 to Km 134.800 [New Chainage Km 31.462 to Km 31.612 (Length 0.15 Km)] in the state of Nagaland in FY: 2024-25

  • Read more about Short Term Maintenance Contract of Dimapur-Kohima Section on NH-29 from old chainage Km 134.650 to Km 134.800 [New Chainage Km 31.462 to Km 31.612 (Length 0.15 Km)] in the state of Nagaland in FY: 2024-25

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Current page 9
  • Page 10
  • Page 11
  • Page 12
  • Page 13
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 04/09/2025

  • Total Visitors: 123487