Providing the Services of Vehicle(Bolero) on Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim) Read more about Providing the Services of Vehicle(Bolero) on Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim)
Providing the Services of Vehicle(Scorpio) on Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim) Read more about Providing the Services of Vehicle(Scorpio) on Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim)
Widening to 2 (Two) Lane with Paved Shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 15.940 to km 33.120 (Existing Chainage km 15.946 to km 33.955) (Length = 17.180 km) (PKG-2) in the State of Manipur on Engineering, Procurement & Co Read more about Widening to 2 (Two) Lane with Paved Shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 15.940 to km 33.120 (Existing Chainage km 15.946 to km 33.955) (Length = 17.180 km) (PKG-2) in the State of Manipur on Engineering, Procurement & Co
Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (P-2) on Sairang – Phaibawk section of NH-6 in the Mizoram Read more about Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (P-2) on Sairang – Phaibawk section of NH-6 in the Mizoram
Construction Four laning of N. Kawnpui (N. Mualvum) –Mualkhang via Khamrang Village section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+850 to km 123+400) on Silchar – Vairengte – Sairang road in the State Read more about Construction Four laning of N. Kawnpui (N. Mualvum) –Mualkhang via Khamrang Village section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+850 to km 123+400) on Silchar – Vairengte – Sairang road in the State
RFP for Consultancy services as Authority’s Engineer for Supervision of: (i) Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahma Read more about RFP for Consultancy services as Authority’s Engineer for Supervision of: (i) Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahma
Widening to 2 (Two) Lane with Paved Shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 15.940 to km 33.120 (Existing Chainage km 15.946 to km 33.955) (Length = 17.180 km) (PKG-2) in the State of Manipur on Engineering, Procurement Read more about Widening to 2 (Two) Lane with Paved Shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 15.940 to km 33.120 (Existing Chainage km 15.946 to km 33.955) (Length = 17.180 km) (PKG-2) in the State of Manipur on Engineering, Procurement
Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construct Read more about Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construct
Consultancy Services as Authority’s Engineer for Supervision of construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway Read more about Consultancy Services as Authority’s Engineer for Supervision of construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway
Restoration of road by way of clearance of landslide, surface boulders including construction of R/walls and B/walls and laying of WBM-III & Bituminous Carpeting on Chatroo-Singpora link road from Km 0.000 to 19.600 in the UT of J&K.for FY 2024-25 Read more about Restoration of road by way of clearance of landslide, surface boulders including construction of R/walls and B/walls and laying of WBM-III & Bituminous Carpeting on Chatroo-Singpora link road from Km 0.000 to 19.600 in the UT of J&K.for FY 2024-25