Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118+850 to km 132+037 (Package-4A) in the State of Manipur on EPC Mode

  • Read more about Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118+850 to km 132+037 (Package-4A) in the State of Manipur on EPC Mode

Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode

  • Read more about Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode

Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya.

  • Read more about Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya.

Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode

  • Read more about Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode

Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118+850 to km 132+037 (Package-4A) in the State of Manipur on EPC Mode

  • Read more about Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118+850 to km 132+037 (Package-4A) in the State of Manipur on EPC Mode

Consultancy Services as Authority’s Engineer for Supervision of Construction of Four laning of N. Kawnpui (N. Mualvvum) – Mualkhang via Khamrang Village section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+85

  • Read more about Consultancy Services as Authority’s Engineer for Supervision of Construction of Four laning of N. Kawnpui (N. Mualvvum) – Mualkhang via Khamrang Village section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+85

4 – Laning of Silchar (near Budha Nagar) at Existing Km 233+000 (D. Ch.24+560) to Jiribam at Existing km 212+060 (D. Ch. 37+650) of NH-37 (Length: 13.09 km) in the State of Assam and Manipur under NH(O)-NE on Hybrid Annuity Mode (HAM) (Pkg-2)

  • Read more about 4 – Laning of Silchar (near Budha Nagar) at Existing Km 233+000 (D. Ch.24+560) to Jiribam at Existing km 212+060 (D. Ch. 37+650) of NH-37 (Length: 13.09 km) in the State of Assam and Manipur under NH(O)-NE on Hybrid Annuity Mode (HAM) (Pkg-2)

Consultancy Services as Authority’s Engineer for Supervision during O&M period for “(i) 1000 m length Viaduct at Rangpo between Km 51.10 to Km 53.90 on Sevoke-Gangtok Road, NH-10 (Old NH-31A) in the State of West Bengal/Sikkim (ii) 2-lane with paved shoul

  • Read more about Consultancy Services as Authority’s Engineer for Supervision during O&M period for “(i) 1000 m length Viaduct at Rangpo between Km 51.10 to Km 53.90 on Sevoke-Gangtok Road, NH-10 (Old NH-31A) in the State of West Bengal/Sikkim (ii) 2-lane with paved shoul

Construction of 2-laning with Paved/ Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State of Nagaland on EPC Mode

  • Read more about Construction of 2-laning with Paved/ Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State of Nagaland on EPC Mode

Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH-206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya

  • Read more about Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH-206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya

Pagination

  • First page « First
  • Previous page ‹ Previous
  • Page 1
  • Current page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 04/09/2025

  • Total Visitors: 123481