Consultancy Services as Independent Engineer during Operation and Maintenance of Z-Morh tunnel including approaches on Srinagar Sonamarg section connecting National Highway no. 1 in the UT of J&K on DBFOT annuity basis Read more about Consultancy Services as Independent Engineer during Operation and Maintenance of Z-Morh tunnel including approaches on Srinagar Sonamarg section connecting National Highway no. 1 in the UT of J&K on DBFOT annuity basis
Balance work for construction of 2-Lane with Hard Shoulders of Demwe Brahmakund Section of NH-13 from Ch. 0.000 Km to 18.464 Km in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE Read more about Balance work for construction of 2-Lane with Hard Shoulders of Demwe Brahmakund Section of NH-13 from Ch. 0.000 Km to 18.464 Km in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE
Consultancy Services as Authority’s Engineer for Supervision during O&M period for “(i) 1000 m length Viaduct at Rangpo between Km 51.10 to Km 53.90 on Sevoke-Gangtok Road, NH-10 (Old NH-31A) in the State of West Bengal/Sikkim (ii) 2-lane with paved shoul Read more about Consultancy Services as Authority’s Engineer for Supervision during O&M period for “(i) 1000 m length Viaduct at Rangpo between Km 51.10 to Km 53.90 on Sevoke-Gangtok Road, NH-10 (Old NH-31A) in the State of West Bengal/Sikkim (ii) 2-lane with paved shoul
Short Term Maintenance Contract for Protection of hill slope and Restoration of approach road of 4-laning of Dimapur-Kohima section on NH-29 from Km 142.400 to Km 142.450 in the state of Nagaland in FY 2024-25 Percentage Rate and work Order Basis Read more about Short Term Maintenance Contract for Protection of hill slope and Restoration of approach road of 4-laning of Dimapur-Kohima section on NH-29 from Km 142.400 to Km 142.450 in the state of Nagaland in FY 2024-25 Percentage Rate and work Order Basis
Short Term Maintenance Contract for Restoration of 4-laning of Dimapur-Kohima section on NH-29 from Km 126+600 to Km 126+800 in the state of Nagaland in FY: 2024- 25 (Percentage Rate and work Order Basis) at the Risk & Cost of EPC Contractor Read more about Short Term Maintenance Contract for Restoration of 4-laning of Dimapur-Kohima section on NH-29 from Km 126+600 to Km 126+800 in the state of Nagaland in FY: 2024- 25 (Percentage Rate and work Order Basis) at the Risk & Cost of EPC Contractor
Construction of 2-laning with Paved/ Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State of Nagaland on EPC Mode under NH (O) (Package-1A) under SARDPNE Read more about Construction of 2-laning with Paved/ Hard Shoulder of Peren-Dimapur road section on NH-129A from design km 120.320 to design km 123.200 (Design length: 2.88 km in Peren town) in the State of Nagaland on EPC Mode under NH (O) (Package-1A) under SARDPNE
Construction of Link Road from Bargana Vittage on Old Goha-Khettani Road to New NH-244 in the UT of Jammu & Kashmir in FY 2024-2i on EPC Mode Read more about Construction of Link Road from Bargana Vittage on Old Goha-Khettani Road to New NH-244 in the UT of Jammu & Kashmir in FY 2024-2i on EPC Mode
Short Term Maintenance Contract for Restoration of 4-laning of Dimapur-Kohima section on NH-29 from Km 126+080 to Km 126+240 in the state of Nagaland in FY: 2024-25 (Percentage Rate and work Order Basis) Read more about Short Term Maintenance Contract for Restoration of 4-laning of Dimapur-Kohima section on NH-29 from Km 126+080 to Km 126+240 in the state of Nagaland in FY: 2024-25 (Percentage Rate and work Order Basis)
Short Term Maintenance Contract for Balance works of NH-39 New NH-02 from Kohima to Mao Stretch from Km 185.540 to Km 212.334 Length 26.794 Km in the State of Nagaland in the FY 2024-25 – Percentage Rate and Work Order Basis Read more about Short Term Maintenance Contract for Balance works of NH-39 New NH-02 from Kohima to Mao Stretch from Km 185.540 to Km 212.334 Length 26.794 Km in the State of Nagaland in the FY 2024-25 – Percentage Rate and Work Order Basis
Balance work for construction of 2-Lane with Hard Shoulders of Demwe-Brahmakund Section of NH-13 from Ch. 0.000 Km to 18.464 Km in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE Read more about Balance work for construction of 2-Lane with Hard Shoulders of Demwe-Brahmakund Section of NH-13 from Ch. 0.000 Km to 18.464 Km in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE