Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Jang to Lumla (Length = 60 Km) in the State of Arunachal Pradesh on fixed cost cum quality basis (Package-II) Read more about Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Jang to Lumla (Length = 60 Km) in the State of Arunachal Pradesh on fixed cost cum quality basis (Package-II)
Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Kamenbari to Tenga (Length = 60 Km) in the State of Arunachal Pradesh on fixed cost cum quality basis (Package-I) Read more about Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Kamenbari to Tenga (Length = 60 Km) in the State of Arunachal Pradesh on fixed cost cum quality basis (Package-I)
Technical Evaluation Result for Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61 (New NH-29) And NH-39 (New NH-02) From Design Km 0.00 To Design Km 10.500 [Design Length-10.500 km] Read more about Technical Evaluation Result for Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61 (New NH-29) And NH-39 (New NH-02) From Design Km 0.00 To Design Km 10.500 [Design Length-10.500 km]
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram
Technical Evaluation Results for Balance Work for Construction of Two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing Km 30.474(Near Kidwema road Chakahabama) to existing Km 53.220 (Near Kikruma village) [Design km 29.6 Read more about Technical Evaluation Results for Balance Work for Construction of Two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing Km 30.474(Near Kidwema road Chakahabama) to existing Km 53.220 (Near Kikruma village) [Design km 29.6
Technical Evaluation Result for Consultancy services for Authority’s Engineer for the following projects: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in ii) the State of Assam starting from km 136.500 Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for the following projects: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in ii) the State of Assam starting from km 136.500
Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of Construction of four lane with paved shoulder Agartala bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in t Read more about Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of Construction of four lane with paved shoulder Agartala bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in t
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configu Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configu
RFP for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of Nagaland on EPC mode unde Read more about RFP for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of Nagaland on EPC mode unde
RFP for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim, Uttarakhand, Himachal Pradesh & UT of Ladakh in high altitude remote areas on lumpsum mode Read more about RFP for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim, Uttarakhand, Himachal Pradesh & UT of Ladakh in high altitude remote areas on lumpsum mode