Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 66 Singtam Shantinagar to Km 80 Indian Oil Fuel Station in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022. Read more about Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 66 Singtam Shantinagar to Km 80 Indian Oil Fuel Station in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.
Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 52 Rangpo to Km 66 Singtam Shantinagar in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022. Read more about Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 52 Rangpo to Km 66 Singtam Shantinagar in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4 th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to C Read more about Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4 th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to C
Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. Dated : 19-09-2022. Read more about Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. Dated : 19-09-2022.
Technical Evaluation Result for Four laning of Demow (534.800) to End of Moran bypass (Km 561.700) of NH-37 including Emergency Landing Facility (ELF) in the State of Assam under on EPC Mode. Dated : 19-09-2022. Read more about Technical Evaluation Result for Four laning of Demow (534.800) to End of Moran bypass (Km 561.700) of NH-37 including Emergency Landing Facility (ELF) in the State of Assam under on EPC Mode. Dated : 19-09-2022.
Technical Evaluation Result for Restoration & Rehabilitation of Imphal-Kohima Road from Km 212.325 to Km 263.00 (Length: 50.675 Km) of NH-02 in the state of Manipur in the year 2022-2023 on EPC mode. Dated : 10-09-2022. Read more about Technical Evaluation Result for Restoration & Rehabilitation of Imphal-Kohima Road from Km 212.325 to Km 263.00 (Length: 50.675 Km) of NH-02 in the state of Manipur in the year 2022-2023 on EPC mode. Dated : 10-09-2022.
Technical Evaluation Result for award of rate contract for repair and maintenance (including supply of requisite material/parts) of office furniture & fixture misc day to day items, plumbing, carpentry work etc. at National Highways & Infrastructure Devel Read more about Technical Evaluation Result for award of rate contract for repair and maintenance (including supply of requisite material/parts) of office furniture & fixture misc day to day items, plumbing, carpentry work etc. at National Highways & Infrastructure Devel
Technical Evaluation Result for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office at Ground, 2n Read more about Technical Evaluation Result for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office at Ground, 2n
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Improvement/widening to Two laning with earthen shoulder of Nongjri (Design Ch. 30.00km) to Maheshkola (Design Ch. 55.525km) [R-M-B PackageII] on SH-4 se Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Improvement/widening to Two laning with earthen shoulder of Nongjri (Design Ch. 30.00km) to Maheshkola (Design Ch. 55.525km) [R-M-B PackageII] on SH-4 se
Technical Evaluation Result for SELECTION OF CONSULTANTs/ NGOs TO ASSIST IN IMPLEMENTATION OF RESETTLEMENT ACTION PLAN FOR: “UP-GRADATION /WIDENING AND CONSTRUCTION OF 4 – LANE WITH PAVED SHOULDERS FROM SRIRAMPUR TO DHUBRI (LENGTH 54.154 KM) OF NH-127B IN Read more about Technical Evaluation Result for SELECTION OF CONSULTANTs/ NGOs TO ASSIST IN IMPLEMENTATION OF RESETTLEMENT ACTION PLAN FOR: “UP-GRADATION /WIDENING AND CONSTRUCTION OF 4 – LANE WITH PAVED SHOULDERS FROM SRIRAMPUR TO DHUBRI (LENGTH 54.154 KM) OF NH-127B IN