Technical Evaluation Result for Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of “Up-gradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj ( Read more about Technical Evaluation Result for Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of “Up-gradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj (
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and pre- construction activities in respect of “Widening of existing carriageway into 2-lane with paved shoulder configuration and Several slope protection wo Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and pre- construction activities in respect of “Widening of existing carriageway into 2-lane with paved shoulder configuration and Several slope protection wo
Technical Evaluation Result for and Widening to two lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) o. Dated : 06-02-2023. Read more about Technical Evaluation Result for and Widening to two lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) o. Dated : 06-02-2023.
Technical Evaluation Result for Construction of Uni-directional Singhpora – Vailoo Tunnel (Under Sinthanpass) of length 10.331km/10.363km (Tube-1/Tube-2)and its approach road from Km 111+067 (at Chhatroo km 140.870 on NH-244) to 149+678(at vailoo Juncti Read more about Technical Evaluation Result for Construction of Uni-directional Singhpora – Vailoo Tunnel (Under Sinthanpass) of length 10.331km/10.363km (Tube-1/Tube-2)and its approach road from Km 111+067 (at Chhatroo km 140.870 on NH-244) to 149+678(at vailoo Juncti
Technical Evaluation Result for empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 24-01-2023. Read more about Technical Evaluation Result for empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 24-01-2023.
Technical Evaluation Result for WIDENING TO 2 (TWO) LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+975 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE. Dated : 17-01-2023. Read more about Technical Evaluation Result for WIDENING TO 2 (TWO) LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+975 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE. Dated : 17-01-2023.
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023. Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023.
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-III (Design Chainage 69+875 Km to 106+816 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023. Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-III (Design Chainage 69+875 Km to 106+816 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023.
Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA BYPASS ROAD CONNECTING NH-39 (NEWNH-02),NH-150 (NEW NH-02), NH-61(NEW NH-29) AND NH-39 (NEWNH-02) FROM DESIGN KM21.000 TO DESIGN KM 32.268 [DESIGN LENGTH 11.268 KM IN T Read more about Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA BYPASS ROAD CONNECTING NH-39 (NEWNH-02),NH-150 (NEW NH-02), NH-61(NEW NH-29) AND NH-39 (NEWNH-02) FROM DESIGN KM21.000 TO DESIGN KM 32.268 [DESIGN LENGTH 11.268 KM IN T
Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA- BYPASS ROAD CONNECTING NH-39 (NEW NH-02), NH-150(NEW NH-02), NH- 61(NEW NH-29) AND NH-39 (NEW NH-02) FROM DESIGN KM 0.00 TO DESIGN KM 10.500 [DESIGN LENGTH – 10.500 K Read more about Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA- BYPASS ROAD CONNECTING NH-39 (NEW NH-02), NH-150(NEW NH-02), NH- 61(NEW NH-29) AND NH-39 (NEW NH-02) FROM DESIGN KM 0.00 TO DESIGN KM 10.500 [DESIGN LENGTH – 10.500 K