Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length 34.494 km) from Design Chainage km 75+000 to km 109+ Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length 34.494 km) from Design Chainage km 75+000 to km 109+
Technical Evaluation Result Consultancy Services as Authority’s Engineer for Supervision of :(i)“Rehabilitation and Augmentation of 4 laning of Numaligarh to Jorhat section from Km 402.500 to Km 453.00 of NH-37 except construction of Dergaon Bypass from K Read more about Technical Evaluation Result Consultancy Services as Authority’s Engineer for Supervision of :(i)“Rehabilitation and Augmentation of 4 laning of Numaligarh to Jorhat section from Km 402.500 to Km 453.00 of NH-37 except construction of Dergaon Bypass from K
Pre-Qualification Result for appointment of a Creative Agency for providing a Creative/communication strategy and creative designs etc to Ministry of Road Transport & Highways and its allied agencies. Dated : 24-06-2022. Read more about Pre-Qualification Result for appointment of a Creative Agency for providing a Creative/communication strategy and creative designs etc to Ministry of Road Transport & Highways and its allied agencies. Dated : 24-06-2022.
Technical Evaluation Result for Special Repairs by Installation of “W” – Metal Beam Crash Barrier(type-A), between km 0+000 to km 107+000 on NH-4 in the Union Territory of Andaman & Nicobar Islands on Item Rate Basis in the FY 2022-23. Dated : 28-05-2022. Read more about Technical Evaluation Result for Special Repairs by Installation of “W” – Metal Beam Crash Barrier(type-A), between km 0+000 to km 107+000 on NH-4 in the Union Territory of Andaman & Nicobar Islands on Item Rate Basis in the FY 2022-23. Dated : 28-05-2022.
Revised Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 & 6) of NH306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km Read more about Revised Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 & 6) of NH306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akash Bridge – Jessami section of NH-202 for Package-II (Design Chainage 325+440 Km to 340+160 Km) in the State of Manipur on EPC mode under NH(O)-NE. Dated : 25-05-2022. Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akash Bridge – Jessami section of NH-202 for Package-II (Design Chainage 325+440 Km to 340+160 Km) in the State of Manipur on EPC mode under NH(O)-NE. Dated : 25-05-2022.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at Kampty fall (Mussoorie) in the State of Uttarakhand. Dated : 23-05-2022. Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at Kampty fall (Mussoorie) in the State of Uttarakhand. Dated : 23-05-2022.
Technical Evaluation Result for Engagement of Consultant For “Collection of Road Inventory & Pavement Condition Data of National Highways in the State of Arunachal Pradesh for uploading on Road Asset Management System (RAMS)”. Dated : 01-05-2022. Read more about Technical Evaluation Result for Engagement of Consultant For “Collection of Road Inventory & Pavement Condition Data of National Highways in the State of Arunachal Pradesh for uploading on Road Asset Management System (RAMS)”. Dated : 01-05-2022.
Technical Evaluation Result for Repair & Maintenance of the stretch from Jhanji (Km 491.050) to Demow (Km 535.250) of NH-37 in the State of Assam under M&R FY22-23. Dated : 29-04-2022. Read more about Technical Evaluation Result for Repair & Maintenance of the stretch from Jhanji (Km 491.050) to Demow (Km 535.250) of NH-37 in the State of Assam under M&R FY22-23. Dated : 29-04-2022.
Revised Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 581+700 of NH 37 to km 606+300 of NH-37 on existing Dibrugarh- Lahoal – Chabua Read more about Revised Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 581+700 of NH 37 to km 606+300 of NH-37 on existing Dibrugarh- Lahoal – Chabua