Technical Evaluation Result for Construction of 2 lane Minor Bridge at Km 26.700 (Dhanikhadi) in CRZ area on NH-4 in the Union Territory of Andaman & Nicobar Islands on EPC basis. Dated: 27-11-2021. Read more about Technical Evaluation Result for Construction of 2 lane Minor Bridge at Km 26.700 (Dhanikhadi) in CRZ area on NH-4 in the Union Territory of Andaman & Nicobar Islands on EPC basis. Dated: 27-11-2021.
Technical Evaluation Result for Ordinary repair of NH-208 of length 22.731 Km in the stretches from Ch. 208.800 km (Jatanbari Tri-junction) to Ch. 231.530 (Ailmara Tri-junction) in the state of Tripura in the FY 2021-22 on work order basis (3rd Call). Dat Read more about Technical Evaluation Result for Ordinary repair of NH-208 of length 22.731 Km in the stretches from Ch. 208.800 km (Jatanbari Tri-junction) to Ch. 231.530 (Ailmara Tri-junction) in the state of Tripura in the FY 2021-22 on work order basis (3rd Call). Dat
Technical Evaluation Result for Restoration &Rehabilitation of Ukhrul-Toloi-Tadubi road section from Km 60.00 to Km 115.00 covering Km 55.00 length on NH-102A in the state of Manipur in the year 2021-2022 on Item Rate Basis. Dated: 18-11-2021. Read more about Technical Evaluation Result for Restoration &Rehabilitation of Ukhrul-Toloi-Tadubi road section from Km 60.00 to Km 115.00 covering Km 55.00 length on NH-102A in the state of Manipur in the year 2021-2022 on Item Rate Basis. Dated: 18-11-2021.
Technical Evaluation Result for Restoration & Rehabilitation of Lainey Bridge to Jessami Road from Km 120.367 to Km 132.00 on NH-29 in the state of Manipur in the year 2021-2022 on Item Rate Basis (2nd Call). Dated: 18-11-2021. Read more about Technical Evaluation Result for Restoration & Rehabilitation of Lainey Bridge to Jessami Road from Km 120.367 to Km 132.00 on NH-29 in the state of Manipur in the year 2021-2022 on Item Rate Basis (2nd Call). Dated: 18-11-2021.
Technical Evaluation Result for Restoration & Rehabilitation of Lainey Bridge to Jessami Road from Km 120.367 to Km 132.00 on NH-29 in the state of Manipur in the year 2021-2022 on Item Rate Basis (2nd Call). Dated: 18-11-2021. Read more about Technical Evaluation Result for Restoration & Rehabilitation of Lainey Bridge to Jessami Road from Km 120.367 to Km 132.00 on NH-29 in the state of Manipur in the year 2021-2022 on Item Rate Basis (2nd Call). Dated: 18-11-2021.
Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for PMU BOMDILA, Arunachal Pradesh. Dated: 13-11-2021. Read more about Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for PMU BOMDILA, Arunachal Pradesh. Dated: 13-11-2021.
Technical Evaluation Result for Restoration & Repairs of Jammu-Akhnoor road section in NH-144A from (Thati Chowk) to (Hanuman Chowk) (km 26.350 to Km 30.097) [Total Length 3.747 km] in the UT of Jammu & Kashmir in the year 2021-22. Dated: 08-11-2021. Read more about Technical Evaluation Result for Restoration & Repairs of Jammu-Akhnoor road section in NH-144A from (Thati Chowk) to (Hanuman Chowk) (km 26.350 to Km 30.097) [Total Length 3.747 km] in the UT of Jammu & Kashmir in the year 2021-22. Dated: 08-11-2021.
Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for PMU-DIPHU, Assam. Second Call. Dated: 03-11-2021. Read more about Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for PMU-DIPHU, Assam. Second Call. Dated: 03-11-2021.
Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for PMU-DIPHU, Assam. Second Call. Dated: 03-11-2021. Read more about Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for PMU-DIPHU, Assam. Second Call. Dated: 03-11-2021.
Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I). Dated: 05-11- Read more about Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I). Dated: 05-11-