Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu
Technical Evaluation Result for Four laning of Vairengte – Chhimluang section (Package-3) of NH-306 from Existing Chainage km 43+000 to km 59+700 (Design Chainage km 46+000 to km 60+850) on Silchar – Vairengte – Sairang road in the State of Mizoram und Read more about Technical Evaluation Result for Four laning of Vairengte – Chhimluang section (Package-3) of NH-306 from Existing Chainage km 43+000 to km 59+700 (Design Chainage km 46+000 to km 60+850) on Silchar – Vairengte – Sairang road in the State of Mizoram und
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Pawlrang – Rulchawm section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage km 72.030 to km 104.129 including 2.459 km re-alignment section from Tuivawl Read more about Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Pawlrang – Rulchawm section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage km 72.030 to km 104.129 including 2.459 km re-alignment section from Tuivawl
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Ngopa – Pawlrang section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage km 32.796 to km 72.030 [Design Chainage km 31.280 to km 68.170] (Package-II) i Read more about Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Ngopa – Pawlrang section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage km 32.796 to km 72.030 [Design Chainage km 31.280 to km 68.170] (Package-II) i
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Ch. from Km 101+280 to Km 131+280 (PKG-5) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Date Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Ch. from Km 101+280 to Km 131+280 (PKG-5) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Date
Technical Evaluation Result for Construction of 2 lane Minor Bridge at Km 26.700 (Dhanikhadi) in CRZ area on NH-4 in the Union Territory of Andaman & Nicobar Islands on EPC basis. Dated: 27-11-2021. Read more about Technical Evaluation Result for Construction of 2 lane Minor Bridge at Km 26.700 (Dhanikhadi) in CRZ area on NH-4 in the Union Territory of Andaman & Nicobar Islands on EPC basis. Dated: 27-11-2021.
Technical Evaluation Result for Ordinary repair of NH-208 of length 22.731 Km in the stretches from Ch. 208.800 km (Jatanbari Tri-junction) to Ch. 231.530 (Ailmara Tri-junction) in the state of Tripura in the FY 2021-22 on work order basis (3rd Call). Dat Read more about Technical Evaluation Result for Ordinary repair of NH-208 of length 22.731 Km in the stretches from Ch. 208.800 km (Jatanbari Tri-junction) to Ch. 231.530 (Ailmara Tri-junction) in the state of Tripura in the FY 2021-22 on work order basis (3rd Call). Dat
Technical Evaluation Result for Restoration &Rehabilitation of Ukhrul-Toloi-Tadubi road section from Km 60.00 to Km 115.00 covering Km 55.00 length on NH-102A in the state of Manipur in the year 2021-2022 on Item Rate Basis. Dated: 18-11-2021. Read more about Technical Evaluation Result for Restoration &Rehabilitation of Ukhrul-Toloi-Tadubi road section from Km 60.00 to Km 115.00 covering Km 55.00 length on NH-102A in the state of Manipur in the year 2021-2022 on Item Rate Basis. Dated: 18-11-2021.
Technical Evaluation Result for Restoration & Rehabilitation of Lainey Bridge to Jessami Road from Km 120.367 to Km 132.00 on NH-29 in the state of Manipur in the year 2021-2022 on Item Rate Basis (2nd Call). Dated: 18-11-2021. Read more about Technical Evaluation Result for Restoration & Rehabilitation of Lainey Bridge to Jessami Road from Km 120.367 to Km 132.00 on NH-29 in the state of Manipur in the year 2021-2022 on Item Rate Basis (2nd Call). Dated: 18-11-2021.