Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021. Read more about Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.
Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I).. Dated: 06-10 Read more about Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I).. Dated: 06-10
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+ Read more about Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+
Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a Read more about Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a
Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a Read more about Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a
Technical Evaluation Result for Award of rate contract for repair and maintenance (including supply of requisite materials/part) of office furniture & fixture and day to day items, plumbing, carpentry work, etc. at National Highways Infrastructure Develop Read more about Technical Evaluation Result for Award of rate contract for repair and maintenance (including supply of requisite materials/part) of office furniture & fixture and day to day items, plumbing, carpentry work, etc. at National Highways Infrastructure Develop
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna
Technical Evaluation Result for Restoration and Repairs (R&R)/Strengthening to Single Lane with Earthen Shoulder of Srirampur to Dhubri section of Newly declared NH-127B (old Village road) from Existing Km 7.700 to Km 24.400 (Gossaigaon- Tamahat Road), Read more about Technical Evaluation Result for Restoration and Repairs (R&R)/Strengthening to Single Lane with Earthen Shoulder of Srirampur to Dhubri section of Newly declared NH-127B (old Village road) from Existing Km 7.700 to Km 24.400 (Gossaigaon- Tamahat Road),