Technical Evaluation Result for Special Repair work of construction of RCC Cover drain, earthen drain and Pipe culverts at different location under Sabroom Sub-Division, South Tripura District along the National Highway – 08 in the State of Tripura. Dated Read more about Technical Evaluation Result for Special Repair work of construction of RCC Cover drain, earthen drain and Pipe culverts at different location under Sabroom Sub-Division, South Tripura District along the National Highway – 08 in the State of Tripura. Dated
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated: 26-08-2021. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated: 26-08-2021.
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20 Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20 Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20
Final Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Upgradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridg Read more about Final Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Upgradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridg
Technical Evaluation Result for Detailed survey of various roads under RO Srinagar using Network Survey Vehicle (NSV) in the UT of Jammu & Kashmir. Dated: 23-08-2021. Read more about Technical Evaluation Result for Detailed survey of various roads under RO Srinagar using Network Survey Vehicle (NSV) in the UT of Jammu & Kashmir. Dated: 23-08-2021.
Technical Evaluation Result for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. Dated: 18-08-2021. Read more about Technical Evaluation Result for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. Dated: 18-08-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Pro Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Pro