Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Special Repair work of construction of RCC Cover drain, earthen drain and Pipe culverts at different location under Sabroom Sub-Division, South Tripura District along the National Highway – 08 in the State of Tripura. Dated

  • Read more about Technical Evaluation Result for Special Repair work of construction of RCC Cover drain, earthen drain and Pipe culverts at different location under Sabroom Sub-Division, South Tripura District along the National Highway – 08 in the State of Tripura. Dated

Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated: 26-08-2021.

  • Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated: 26-08-2021.

Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.

  • Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.

Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.

  • Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.

Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20

  • Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20

Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20

  • Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20

Final Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Upgradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridg

  • Read more about Final Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Upgradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridg

Technical Evaluation Result for Detailed survey of various roads under RO Srinagar using Network Survey Vehicle (NSV) in the UT of Jammu & Kashmir. Dated: 23-08-2021.

  • Read more about Technical Evaluation Result for Detailed survey of various roads under RO Srinagar using Network Survey Vehicle (NSV) in the UT of Jammu & Kashmir. Dated: 23-08-2021.

Technical Evaluation Result for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. Dated: 18-08-2021.

  • Read more about Technical Evaluation Result for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. Dated: 18-08-2021.

Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Pro

  • Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Pro

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 37
  • Page 38
  • Page 39
  • Page 40
  • Current page 41
  • Page 42
  • Page 43
  • Page 44
  • Page 45
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 10/09/2025

  • Total Visitors: 138419