Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 2: Minamarg-Kargil). Dated: 13-08-2021. Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 2: Minamarg-Kargil). Dated: 13-08-2021.
Revised Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in Read more about Revised Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in
Technical Evaluation Result for Supply, Installation, Testing and Commissioning of 01No. Diesel Generator Set (30kVA, Single Phase) for NHIDCL, Regional Office at Itanagar. Dated: 11-08-2021. Read more about Technical Evaluation Result for Supply, Installation, Testing and Commissioning of 01No. Diesel Generator Set (30kVA, Single Phase) for NHIDCL, Regional Office at Itanagar. Dated: 11-08-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 1: Srinagar-Minamarg). Dated: 10-08-2021. Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 1: Srinagar-Minamarg). Dated: 10-08-2021.
Technical Evaluation Result for Repair & Maintenance of NH-37 Missa Army Area from Km 301.800 to Km 307.700 under Risk & Cost of the EPC Contractor.(Item Rate and Work Order Basis). Dated: 07-08-2021. Read more about Technical Evaluation Result for Repair & Maintenance of NH-37 Missa Army Area from Km 301.800 to Km 307.700 under Risk & Cost of the EPC Contractor.(Item Rate and Work Order Basis). Dated: 07-08-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State o Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State o
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State o Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State o
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: i) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PK Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: i) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PK
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+4 Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+4
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in