Technical Evaluation Result for Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construct Read more about Technical Evaluation Result for Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construct
Technical Evaluation Result for Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construct Read more about Technical Evaluation Result for Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construct
Technical Evaluation Result for Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construct Read more about Technical Evaluation Result for Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construct
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Da Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Da
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Da Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Da
Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 111.580 (Package-I, Read more about Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 111.580 (Package-I,
Technical Evaluation Result for Supply of Pantry Items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) HQ at its office at PTI Building, Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated: 01-07 Read more about Technical Evaluation Result for Supply of Pantry Items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) HQ at its office at PTI Building, Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated: 01-07
Technical Evaluation Result for Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam on EPC mode. Dated: 01-07-2021. Read more about Technical Evaluation Result for Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam on EPC mode. Dated: 01-07-2021.
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunac Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunac
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunac Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunac