Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for strengthening works on NH-10 from km. 52.000 to Km 80.000 on Item Rate Contract Basis in the state of Sikkim for FY 2021-22. Dated: 17-05-2021. Read more about Technical Evaluation Result for strengthening works on NH-10 from km. 52.000 to Km 80.000 on Item Rate Contract Basis in the state of Sikkim for FY 2021-22. Dated: 17-05-2021.
Technical Evaluation Result for Restoration and Repairs of NH-39 (new NH-29) from existing Dimapur-Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2021-22 – 2nd Call. Dated: 19-05-2021. Read more about Technical Evaluation Result for Restoration and Repairs of NH-39 (new NH-29) from existing Dimapur-Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2021-22 – 2nd Call. Dated: 19-05-2021.
Technical Evaluation Result for Strengthening from: Km 912.348 to Km 912.780, Km 916.000 to Km 928.000, Km 938.000 to Km 945.400, Km 946.500 to Km 947.300 & Km 947.700 to Km 948.000 of Bilasipara-Tulungia of NH-31 (New NH-17) in the State of Assam in FY 2 Read more about Technical Evaluation Result for Strengthening from: Km 912.348 to Km 912.780, Km 916.000 to Km 928.000, Km 938.000 to Km 945.400, Km 946.500 to Km 947.300 & Km 947.700 to Km 948.000 of Bilasipara-Tulungia of NH-31 (New NH-17) in the State of Assam in FY 2