Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunac Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunac
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunac Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunac
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 11-06-2021. Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 11-06-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 11-06-2021. Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 11-06-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 11-06-2021. Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 11-06-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.