Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021. Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for strengthening works on NH-10 from km. 52.000 to Km 80.000 on Item Rate Contract Basis in the state of Sikkim for FY 2021-22. Dated: 17-05-2021. Read more about Technical Evaluation Result for strengthening works on NH-10 from km. 52.000 to Km 80.000 on Item Rate Contract Basis in the state of Sikkim for FY 2021-22. Dated: 17-05-2021.
Technical Evaluation Result for Restoration and Repairs of NH-39 (new NH-29) from existing Dimapur-Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2021-22 – 2nd Call. Dated: 19-05-2021. Read more about Technical Evaluation Result for Restoration and Repairs of NH-39 (new NH-29) from existing Dimapur-Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2021-22 – 2nd Call. Dated: 19-05-2021.
Technical Evaluation Result for Strengthening from: Km 912.348 to Km 912.780, Km 916.000 to Km 928.000, Km 938.000 to Km 945.400, Km 946.500 to Km 947.300 & Km 947.700 to Km 948.000 of Bilasipara-Tulungia of NH-31 (New NH-17) in the State of Assam in FY 2 Read more about Technical Evaluation Result for Strengthening from: Km 912.348 to Km 912.780, Km 916.000 to Km 928.000, Km 938.000 to Km 945.400, Km 946.500 to Km 947.300 & Km 947.700 to Km 948.000 of Bilasipara-Tulungia of NH-31 (New NH-17) in the State of Assam in FY 2
Technical Evaluation Result for Strengthening from: Km 6.180 to Km 7.380 & Km 18.835 to Km 30.675 (Length=13.130 Km) and Km 30.765 to Km 42.000 (Length=11.235) of Bilasipara to Guwahati Section of NH-17 (Old NH-37) in the State of Assam in FY 21-22. Dated Read more about Technical Evaluation Result for Strengthening from: Km 6.180 to Km 7.380 & Km 18.835 to Km 30.675 (Length=13.130 Km) and Km 30.765 to Km 42.000 (Length=11.235) of Bilasipara to Guwahati Section of NH-17 (Old NH-37) in the State of Assam in FY 21-22. Dated
Technical Evaluation Result for Strengthening of the Section from Km 40.300 to Km 42.000 of SilcharVaringte, NH-306 in FY 21-22: Second Call. Dated: 13-05-2021. Read more about Technical Evaluation Result for Strengthening of the Section from Km 40.300 to Km 42.000 of SilcharVaringte, NH-306 in FY 21-22: Second Call. Dated: 13-05-2021.
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arun Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arun
Technical Evaluation Result for Vegetation Clearance, Drain Clearance with Pot Patch Repair Work including Protection works in Financial Year 2021 on NH10 (From KM 52 to KM 80) in the state of Sikkim on Percentage Contract Basis. Dated: 04-05-2021. Read more about Technical Evaluation Result for Vegetation Clearance, Drain Clearance with Pot Patch Repair Work including Protection works in Financial Year 2021 on NH10 (From KM 52 to KM 80) in the state of Sikkim on Percentage Contract Basis. Dated: 04-05-2021.