Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BASAM TO TATHI FROM KM 0.000 TO KM 32.060 IN UPPER SUBANSIRI VALLEY DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021. Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BASAM TO TATHI FROM KM 0.000 TO KM 32.060 IN UPPER SUBANSIRI VALLEY DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BRUNI TO LAMA FROM KM 0.000 TO KM 32.800 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021. Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BRUNI TO LAMA FROM KM 0.000 TO KM 32.800 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021.
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Ngopa – Pawlrang section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 32.796 to Km 72.030 [Design Chainage Km 31.280 to Km 68.170] (Package-II) in Read more about Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Ngopa – Pawlrang section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 32.796 to Km 72.030 [Design Chainage Km 31.280 to Km 68.170] (Package-II) in
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Khawkawn(from Bridge across River Tuivai) – Ngopa section of NH102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 to km 32.796 [Design Chainage Km 0.000 Read more about Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Khawkawn(from Bridge across River Tuivai) – Ngopa section of NH102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 to km 32.796 [Design Chainage Km 0.000
Technical Evaluation Result for Special Repair work of construction of RCC Cover drain, earthen drain and Pipe culverts at different location under Sabroom Sub-Division, South Tripura District along the National Highway – 08 in the State of Tripura. Dated Read more about Technical Evaluation Result for Special Repair work of construction of RCC Cover drain, earthen drain and Pipe culverts at different location under Sabroom Sub-Division, South Tripura District along the National Highway – 08 in the State of Tripura. Dated
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated: 26-08-2021. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated: 26-08-2021.
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20 Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20 Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-20