Technical Evaluation Result for Consultancy Services for Identification & Preparation of Detailed Project Report for Slope Protection work on Hill & Valley Side, Sinking Zones and Bridges in between Km 368.000 to Km 468.000 (NH-07), in the State of Uttara Read more about Technical Evaluation Result for Consultancy Services for Identification & Preparation of Detailed Project Report for Slope Protection work on Hill & Valley Side, Sinking Zones and Bridges in between Km 368.000 to Km 468.000 (NH-07), in the State of Uttara
Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on Read more about Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on
Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on Read more about Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on
Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on Read more about Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF FOLLOWING PROJECTS IN THE UNION TERRITORY OF LADAKH. (i) Up-gradation to Intermediate lane of NH-301 Kargil-Zanskar road from km 87.000 to km 98.524 in the UT Read more about Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF FOLLOWING PROJECTS IN THE UNION TERRITORY OF LADAKH. (i) Up-gradation to Intermediate lane of NH-301 Kargil-Zanskar road from km 87.000 to km 98.524 in the UT
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode-2nd Call. Dated: 11-10-2021. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode-2nd Call. Dated: 11-10-2021.
Technical Evaluation Result for Restoration & Rehabilitation of NH -37 of Imphal-Jiribam Road (Km 145.00 to Km 221.138) [Total Length = 76.138 km] in the state of Manipur in the year 2021-2022 (3 rd Call). Dated: 08-10-2021. Read more about Technical Evaluation Result for Restoration & Rehabilitation of NH -37 of Imphal-Jiribam Road (Km 145.00 to Km 221.138) [Total Length = 76.138 km] in the state of Manipur in the year 2021-2022 (3 rd Call). Dated: 08-10-2021.
Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021. Read more about Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.