Technical Evaluation Result for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – Read more about Technical Evaluation Result for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length –
Technical Evaluation Result for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – Read more about Technical Evaluation Result for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length –
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2021-22, 2 nd Call. Dated: 13-09-2021. Read more about Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2021-22, 2 nd Call. Dated: 13-09-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 8 Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 8
Technical Evaluation Result for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Jorhat (Assam). Dated: 08-09-2021. Read more about Technical Evaluation Result for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Jorhat (Assam). Dated: 08-09-2021.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of New Two-Lane Bridge with its approaches from Km 0+000 to Km 4+385 across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of New Two-Lane Bridge with its approaches from Km 0+000 to Km 4+385 across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC
Technical Evaluation Result for Restoration & Rehabilitation of NH-39A of Imphal-Kohima Road (Design Alignment) from Km 287.00 to Km 297.70 (Total Length: 10.70 Km) in the state of Manipur on Item Rate Basis in the FY 2021-22 (3rd call). Dated: 09-09-2021 Read more about Technical Evaluation Result for Restoration & Rehabilitation of NH-39A of Imphal-Kohima Road (Design Alignment) from Km 287.00 to Km 297.70 (Total Length: 10.70 Km) in the state of Manipur on Item Rate Basis in the FY 2021-22 (3rd call). Dated: 09-09-2021
Technical Evaluation Result for Installation of wire mesh fencing on NH land from km 0+350 to km 0+480 and km 2+300 to km 2+580 (old alignment MJB No. 2) of Chenani-Sudhmahadev road section of NH-244 in the UT of Jammu & Kashmir in the year 2021-22. Dated Read more about Technical Evaluation Result for Installation of wire mesh fencing on NH land from km 0+350 to km 0+480 and km 2+300 to km 2+580 (old alignment MJB No. 2) of Chenani-Sudhmahadev road section of NH-244 in the UT of Jammu & Kashmir in the year 2021-22. Dated
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 113+300 to Km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village – Dillai Section (Package-6) of NH 29 in the state of Assam on EPC mode. Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 113+300 to Km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village – Dillai Section (Package-6) of NH 29 in the state of Assam on EPC mode.
Technical Evaluation Result for Consultancy services as Authority’s Engineer for supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil sec Read more about Technical Evaluation Result for Consultancy services as Authority’s Engineer for supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil sec