Technical Evaluation Result for Restoration & Rehabilitation of NH-39A of Imphal-Kohima Road (Design Alignment) from Km 287.00 to Km 297.70 (Total Length: 10.70 Km) in the state of Manipur on Item Rate Basis in the FY 2021-22 (3rd call). Dated: 09-09-2021 Read more about Technical Evaluation Result for Restoration & Rehabilitation of NH-39A of Imphal-Kohima Road (Design Alignment) from Km 287.00 to Km 297.70 (Total Length: 10.70 Km) in the state of Manipur on Item Rate Basis in the FY 2021-22 (3rd call). Dated: 09-09-2021
Technical Evaluation Result for Installation of wire mesh fencing on NH land from km 0+350 to km 0+480 and km 2+300 to km 2+580 (old alignment MJB No. 2) of Chenani-Sudhmahadev road section of NH-244 in the UT of Jammu & Kashmir in the year 2021-22. Dated Read more about Technical Evaluation Result for Installation of wire mesh fencing on NH land from km 0+350 to km 0+480 and km 2+300 to km 2+580 (old alignment MJB No. 2) of Chenani-Sudhmahadev road section of NH-244 in the UT of Jammu & Kashmir in the year 2021-22. Dated
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 113+300 to Km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village – Dillai Section (Package-6) of NH 29 in the state of Assam on EPC mode. Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 113+300 to Km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village – Dillai Section (Package-6) of NH 29 in the state of Assam on EPC mode.
Technical Evaluation Result for Consultancy services as Authority’s Engineer for supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil sec Read more about Technical Evaluation Result for Consultancy services as Authority’s Engineer for supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil sec
Technical Evaluation Result for Balance work of Construction of Two-lane with hard shoulders of Merangkong-Tamlu-Mon Road on EPC basis from existing Km 76.640 to Km 98.065 [Design Km. 63.800 to Km. 86.835] (Design length-23.035 km) in the state of Nagalan Read more about Technical Evaluation Result for Balance work of Construction of Two-lane with hard shoulders of Merangkong-Tamlu-Mon Road on EPC basis from existing Km 76.640 to Km 98.065 [Design Km. 63.800 to Km. 86.835] (Design length-23.035 km) in the state of Nagalan
Technical Evaluation Result for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 80.630 near Mandeu to km 96.870 near Jiri River (Package-6) on EPC mode. Dated: 07-09-2021. Read more about Technical Evaluation Result for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 80.630 near Mandeu to km 96.870 near Jiri River (Package-6) on EPC mode. Dated: 07-09-2021.
Technical Evaluation Result for Repair & Rehabilitation work of Minor Bridge at Km 15.120 of NH31B of Tulungia-Jogighopa Section in the State of Assam in FY 21-22 (4th Call). Dated: 06-09-2021. Read more about Technical Evaluation Result for Repair & Rehabilitation work of Minor Bridge at Km 15.120 of NH31B of Tulungia-Jogighopa Section in the State of Assam in FY 21-22 (4th Call). Dated: 06-09-2021.
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Semi-skilled and skilled manpower on monthly basis for NHIDCL Regional Office (RO) -Itanagar and various PMUs and Site Offices under RO-Itanagar. Dated: 06-09 Read more about Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Semi-skilled and skilled manpower on monthly basis for NHIDCL Regional Office (RO) -Itanagar and various PMUs and Site Offices under RO-Itanagar. Dated: 06-09
Technical Evaluation Result for Special Repair of NH-702, from Mon to Tizit Stretch (from Km 133.00 to Km 177.00) [Total Length = 44.00 Km] in the State of Nagaland for the FY 2021-22 – 2 nd Call. Dated: 03-09-2021. Read more about Technical Evaluation Result for Special Repair of NH-702, from Mon to Tizit Stretch (from Km 133.00 to Km 177.00) [Total Length = 44.00 Km] in the State of Nagaland for the FY 2021-22 – 2 nd Call. Dated: 03-09-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 8 Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 8