Final Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul – Toloi – Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Pack Read more about Final Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul – Toloi – Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Pack
Technical Evaluation Result for Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to Canal Head (D.Ch. 1.350) on Jammu-Akhnoor road section of NH-144A in U Read more about Technical Evaluation Result for Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to Canal Head (D.Ch. 1.350) on Jammu-Akhnoor road section of NH-144A in U
Technical Evaluation Result for Supply of Pantry Items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) HQ at its office at PTI Building, Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated : 01-0 Read more about Technical Evaluation Result for Supply of Pantry Items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) HQ at its office at PTI Building, Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated : 01-0
Technical Evaluation Result for Restoration of road by way of clearance of landslides, Snow including construction of R/Wall, B/Wall and laying of WBM-III, BM and BC on Chatroo-Singpora road From km 0.000 to km 19.600 in the UT of Jammu & Kashmir for FY 2 Read more about Technical Evaluation Result for Restoration of road by way of clearance of landslides, Snow including construction of R/Wall, B/Wall and laying of WBM-III, BM and BC on Chatroo-Singpora road From km 0.000 to km 19.600 in the UT of Jammu & Kashmir for FY 2
Technical Evaluation Result for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri – Phulbari Bridge approach (Package-II) of Srirampur – Dhubri Section of Read more about Technical Evaluation Result for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri – Phulbari Bridge approach (Package-II) of Srirampur – Dhubri Section of
Technical Evaluation Result for Repair and Maintenance of National Highway (NH-40) (Ch. km 81+740 to km 93+490, Ch. Km 123+800 to km Ch 131+820, Ch km 151+330 to 163+400) along the existing road in the State of Meghalaya for the FY 2022-23 (Item Rate Read more about Technical Evaluation Result for Repair and Maintenance of National Highway (NH-40) (Ch. km 81+740 to km 93+490, Ch. Km 123+800 to km Ch 131+820, Ch km 151+330 to 163+400) along the existing road in the State of Meghalaya for the FY 2022-23 (Item Rate
Technical Evaluation Result for Restoration & Rehabilitation of Road from Km 21.00 to Km 28.00 on NH-4 (old NH-233) in the Union Territory of Andaman & Nicobar Islands in the FY 2022-23 on EPC Basis. Dated : 25-07-2022. Read more about Technical Evaluation Result for Restoration & Rehabilitation of Road from Km 21.00 to Km 28.00 on NH-4 (old NH-233) in the Union Territory of Andaman & Nicobar Islands in the FY 2022-23 on EPC Basis. Dated : 25-07-2022.
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Jessami to Akhegwo (Package-1 & 2) from (Design Chainage 283+000 Km to 325+440 Km to 340+160 Km) in the State o Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Jessami to Akhegwo (Package-1 & 2) from (Design Chainage 283+000 Km to 325+440 Km to 340+160 Km) in the State o
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul – Toloi – Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Package-3) Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul – Toloi – Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Package-3)
Technical Evaluation Result for award of contract for disposal of old/obsolete furniture and other items of National Highways & Infrastructure Development Corporation Ltd (NHIDCL) Corporate Office, 3rd Floor of PTI Building, New Delhi. Dated : 19-07-2022. Read more about Technical Evaluation Result for award of contract for disposal of old/obsolete furniture and other items of National Highways & Infrastructure Development Corporation Ltd (NHIDCL) Corporate Office, 3rd Floor of PTI Building, New Delhi. Dated : 19-07-2022.