Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
3191 |
RFP for Restoration & Repair in the selected stretches of NH 08 from (Agartala) to (Udaipur) (Km. 6.800 to Km. 55.000) [Total Length 48.200 Km.] & Estimate for providing “Strip Seal Expansion Joint†at bridge located at Km 9.465 (Design Chainage) on NH-08 (Khayerpur-Amtali road) in the state of Tripura in the year 2023-24 on percentage basis & work order basis. Click Here | Tripura | 02-03-2024 |
3192 |
Quotation for Detailed Survey using MASW (Multi-Channel Analysis of Surface Waves) & ERT (Electrical Resistivity Tomography) Technique for the landslide prone area of Tlakshi on Kanchanpur-Vaghmun section of NH-44A (Package-III). Click Here | Tripura | 04-03-2024 |
3193 |
RFP for Construction for mitigation measures of 10 nos. of Landslides, 01 no. Sinking Zone and 01 no. minor bridge from Km 386.000 to Km 433.000 (65 km length) on NH-07 on EPC mode in the State of Uttarakhand, PKG-I†Click Here | Uttarakhand | 04-03-2024 |
3194 |
RFP for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones from Ch. 433.00 to Ch. 450.00 (17 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-II) Click Here | Uttarakhand | 04-03-2024 |
3195 |
RFP for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones and 1 no. Bridge from Ch. 450.00 to Ch. 468.00 (18 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-III) Click Here | Uttarakhand | 04-03-2024 |
3196 |
RFP for Consultancy Services as Authority’s Engineer for Supervision of :- (i) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 46+704(Total length:46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode. (ii) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting –Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode. Click Here | Arunachal Pradesh | 05-03-2024 |
3197 |
RFP for Providing & supplying of 05 Nos. vehicles (02 Innova (Crysta/Hycross, Top Model) and 03 Bolero or equivalent) on monthly basis for NHIDCL, PMU-Akhnoor(UT of J&K). Click Here | Union Territory of Jammu and Kashmir | 05-03-2024 |
3198 |
RFP for Consultancy Services as Authority’s Engineer for Supervision of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 53+040 (Total Design Length = 53.04 Km) of Tato to Manigong Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh†on EPC mode Click Here | Arunachal Pradesh | 06-03-2024 |
3199 | RFP for Providing & supplying of commercial vehicles (SUVs such as Scorpio or equivalent and Premium SUV/MUV Such as Toyota Innova/Fortuner or equivalent) on a monthly basis for NHIDCL in the State of Mizoram. Click Here | Mizoram | 06-03-2024 |
3200 |
RFP for Consultancy Services as Authority’s Engineer for Supervision of “Construction Four laning of N. Kawnpui (N. Mualvum) –Mualkhang via Khamrang Village section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+850 to km 123+400) on Silchar - Vairengte - Sairang road in the State of Mizoram on EPC mode & Construction of Four Laning of Mualkhang - Sairang Section (Package 8) of NH-6 from existing chainage km142+000 to km158+900 (Design Chainage km 123+400 to km 136+260) on Silchar-Vairengte - Sairang road in the state of Mizoram on EPC mode Click Here | Mizoram | 06-03-2024 |