Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
3181 |
RFP for Rehabilitation and Up-gradation of road from design Km 25.250 to Km 36.460 (Total Length: 11.210 Km) of Kailashahar - Kurti Bridge section of NH- 208A to two lane with paved shoulder in the State of Tripura on EPC mode (Package- III)-Balance work Click Here | Tripura | 22-02-2024 |
3182 |
RPF for Construction of 2-lane Ukhrul bypass starting at km 537.850 of NH-202 & joining at km 8.840 of NH-102A (Ukhrul – Toloi – Tadubi Road) and continuing upto km 9.840 of NH-102A (Package-1, Length-6.571 km) in the State of Manipur on EPC mode. (2nd Call) Click Here | Manipur | 22-02-2024 |
3183 |
RFP for Construction of UG OR Living Bunkers (20 Nos.) and UG Tac HQ (4 Nos. along three different axises from Durbuk in the UT of Ladakh (2nd Call) Click Here | Union Territory of Ladakh | 23-02-2024 |
3184 |
RFP for Consultancy Services as Authority’s Engineer for Supervision of “Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package-2) on Sairang - Phaibawk Click Here | Mizoram | 24-02-2024 |
3185 |
RFP for Construction Four laning of N. Kawnpui (N. Mualvum) – West Serawlg section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+850 to km 123+400) on Silchar - Vairengte - Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode Click Here | Mizoram | 26-02-2024 |
3186 | Notice Inviting Bid for Renting of Office Premises of NHIDCL, Regional Office Gangtok in the State of Sikkim Click Here | Sikkim | 27-02-2024 |
3187 |
RFP for Short term maintenance under Original Repair (Contract Maintenance) works at selected locations between Km 0.00 to km 14.064 of Karimganj-Sutarkandi Section NH 151 (Old)/ NH 37 (New) in the state of Assam during the year 2023-2024-2nd Call Click Here | Assam | 27-02-2024 |
3188 |
RFP for Short term maintenance under Original Repair (Contract Maintenance) works at selected locations between Km 33.262 to km 47.922 (in stretches) of Silchar- Jiribam Section NH 53 (Old)/ NH 37 (New) in the state of Assam during the year 23-24- 2nd Call Click Here | Assam | 27-02-2024 |
3189 |
RFP for Providing & supplying of vehicles (SUV such as Toyota Fortuner, Innova (Crysta/Hycross) on monthly basis for NHIDCL, RO-Jammu (UT of J&K). Click Here | Union Territory of Jammu and Kashmir | 28-02-2024 |
3190 |
RFP for Construction Four laning of West Serawlg-Sairang section (Package-8) of NH-6 from Existing Chainage km 142+000 to km 158+900 (Design Chainage km 123+400 to km 136+260) on Silchar - Vairengte - Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode.â€) Click Here | Mizoram | 28-02-2024 |