Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
3171 |
RFP for Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km (263+070) Donipawa of 8.643 Km Length on Khellani-Khanabal Section of NH-244 in the UT of Jammu and Kashmir Click Here | Union Territory of Jammu and Kashmir | 19-02-2024 |
3172 |
RFP for Ordinary Repair of National Highway Road (NH 208) in selected existing chainages in between Km 108.800 to Km 112.400 & Km 136.400 to Km 139.600 i.e. khowai to Teliamura section under Khowai District in the state of Tripura in the FY 2023-24. Click Here | Tripura | 20-02-2024 |
3173 |
RFP for Construction of Intermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 17.387 (Total length 17.387 km) of Hunli to Ithun Bridge section on NH-913 (Frontier Highway) in State of Arunachal Pradesh†on EPC mode under NH(O)-NE\" Click Here | Arunachal Pradesh | 20-02-2024 |
3174 |
RFP for RFP for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode Click Here | Arunachal Pradesh | 20-02-2024 |
3175 |
RFP for Construction of Intermediate Lane Road with hard Shoulder from design Km 0.000 to Km 13.080 Total length 13.080 km of Tuting to Zido section on NH 913 Frontier Highway Click Here | Arunachal Pradesh | 20-02-2024 |
3176 |
RFP for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode Click Here | Arunachal Pradesh | 20-02-2024 |
3177 |
RFP for Construction of RCC Retaining Wall and Bamboo Palasiding & other embankment protection work at selected location on NH-08 from Km 425+000 to Km 432+000 in the State of Tripura FY 2023- 24 on percentage rate basis. Click Here | Tripura | 21-02-2024 |
3178 |
RFP for Ordinary Repair of NH 08 from (Udaipur) to (Melaghar) (Km. 0.00 to Km. 20.300) and (Km. 22.00 to km.23.000) [Total Length 21.300 Km.] in the state of Tripura in the year 2023- 24 on percentage basis & work order basis Click Here | Tripura | 21-02-2024 |
3179 |
RFP for Repair & Maintenance Work of 2-laning of Hunli-Anini Road from Km 37.500 to Km 53.500 (PKG-II) on Item Rate Basis in the State of Arunachal Pradesh Click Here | Arunachal Pradesh | 21-02-2024 |
3180 |
RFP for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Monigong-Dile Duting, Henkar-Tabeyongkong and Bruni-Balchida’ road approved under ICBR(PH-III) project in the State of Arunachal Pradesh(Total length: 60.00Km)(Package-II)- (2nd Call) Click Here | Arunachal Pradesh | 21-02-2024 |