Sr. No. | Description | STATE / TERRITORY | BID DUE DATESort ascending |
---|---|---|---|
3141 |
RFP for Annual Maintenance Work in the Financial Year 2024 on NH-10 (From KM 53+00 Rangpo to KM 64+00 Singtam Bridge) under the jurisdiction of PMU-Ranipool, NHIDCL on Item Rate Contract Basis in the state of Sikkim. Click Here | Sikkim | 23-01-2024 |
3142 | Quotation for NSV 2nd call / Rehabilitation and Up-gradation of road from design Ch. 11.800 to Ch. 25.250 (Total length: 13.450Km) of Kailashahar - Kurti Bridge section of NH-208A to two lane with paved shoulder in the State of Tripura on EPC basis (Package-II)-2nd call Click Here | Tripura | 24-01-2024 |
3143 |
RFP for Construction of UG OR Living Bunkers (20 Nos.) and UG Tac HQ (4 Nos.) along three different axises from Durbuk in the UT of Ladakh Click Here | Union Territory of Ladakh | 27-01-2024 |
3144 |
RFP for Ordinary repair works of Kumarghat to Kailashahar section of NH-208 from existing (bypassed) Ch. 0+000 to 0+800, Ch. 18+500 to 18+700 & Ch.19+100 to 19+500 (Total length=1.400 km) in the State of Tripura in FY 2023-24 on percentage basis (Risk & Cost) Click Here | Tripura | 27-01-2024 |
3145 |
RFP for Maintenance & Repair of existing NH-44A from Chandipur Ch. 75.5 Km to kanchanpur Ch. 86 Km (Total Length = 9.5 Km) in the State of Tripura in F.Y 2023-24 on percentage basis & work order basis Click Here | Tripura | 27-01-2024 |
3146 |
RFP for Repair and restoration of Raising Low laying section along with/without construction of 1000 mm Dia NP-4 Single dia Culvert at different km and Repair of damaged Pavement km 66.8 and construction Side drain at Km 64.5 in the State of Mizoram on percentage rate and work order basis in FY 2023-24 and the same need to be uploaded on NHIDCL official website. Click Here | Mizoram | 29-01-2024 |
3147 |
RFP for Construction & Upgradation to 2 lane with paved shoulder of Balance Work from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar – Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode Pkg-II Click Here | Union Territory of Jammu and Kashmir | 29-01-2024 |
3148 |
RFP for RFP for Consultancy services for Authority’s Engineer for Supervision of:(i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP(ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 163.592 to Km 173.850 (Length – 10.258 Km) in the state of Nagaland on EPC mode (Pkg – IV) under NH (O) – TSP(iii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH (O) – TSP-Tender documents Click Here | Nagaland | 30-01-2024 |
3149 |
RFP for Construction of North East Regional Office of National Highways & Infrastructure Development Corporation Ltd. at Guwahati, Assam on EPC mode (Balance Work) Click Here | Assam | 30-01-2024 |
3150 |
RFP for Four Laning of Badarpur – Churaibari section of NH-8 from Design chainage 87.700 (Chandkhira) to Km. 106.730 Churaibari (Assam-Tripura border) in the state of Assam (Package-VI) Click Here | Assam | 31-01-2024 |