3201

    RFP for Consultancy services as Authority’s Engineer for Supervision of: (i) Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: 24.819 Km, Package-I) in the state of Arunachal Pradesh on EPC mode. (ii) Improvement and Widening to two lane with Paved Shoulder of NH-15 (Old NH-52) from Existing Km 770.600 (Design Km 24.819) to Existing km 805.750 (Design Km 59.885) (Kamlang T-Junction to Chowkham, Existing Length: 35.150 Km, Design Length-35.066 Km, Package-II) in the state of Arunachal Pradesh on EPC mode. Click Here

  • NIT
Arunachal Pradesh12-03-2024
3202

    RFP for Consultancy Services as Authority’s Engineer for Supervision of Improvement & Widening of existing NH-08 from Champaknagar to Khayerpur to Four lane with paved shoulder (design Km 242+500 to Km 261+610) in the state of Tripura on EPC basis. Click Here

  • NIT
Tripura12-03-2024
3203

    RFP for Consultancy services as Authority’s Engineer for Supervision of: (i) Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 17.387 (Total Design Length = 17.387 Km) of Hunli to Ithun Bridge Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh” on EPC mode. (ii) Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 53.00 (Total Design Length = 53.00 Km) of Hunli to Hyauliang (Package- I) Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh” on EPC mode. Click Here

  • NIT
Arunachal Pradesh13-03-2024
3204

    RFP for Widening & Upgradation to 2-lane with paved shoulder from km 39.450 (start of Pahalgam Bypass) to km 60.680 (Chandanwadi), Package-III of Khanabal - Pahalgam - Chandanwadi - Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC Mode - reg. Click Here

  • NIT
  • DCA
  • Amendment No. 1
Union Territory of Jammu and Kashmir14-03-2024
3205

    RFP for Widening & Upgradation to 4-lane with paved shoulder from km 16.700 (end of Seer Hamdan Bypass) to km 39.450 (start of Pahalgam Bypass), Package-II of Khanabal - Pahalgam - Chandanwadi - Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC Mode - reg. Click Here

  • NIT
  • DCA
  • DPR
  • Amendment No. 1
Union Territory of Jammu and Kashmir14-03-2024
3206

    RFP for Widening & Upgradation to 4-lane with paved shoulder from km 0.000 (Near Sursunoo village on NH-44) to km 16.700 (End of Seer Hamdan Bypass), Package-IA of Khanabal- Pahalgam- Chandanwadi- Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC mode - reg. Click Here

  • NIT
  • DCA
  • DPR
  • Corrigendum No. 1
Union Territory of Jammu and Kashmir14-03-2024
3207

    RFP for Consultancy Services as Authority’s Engineer for Supervision of Construction of Intermediate Lane of Pango to Jorging Road from Design Km 0+000 to Design Km 40+000 (Design Length: 40.00 Km, Package-I, Greenfield Alignment) in the State of Arunachal Pradesh on EPC mode. Click Here

  • NIT
Arunachal Pradesh14-03-2024
3208

    RFP for Consultancy Services as Authority’s Engineer for Supervision of Construction of Intermediate Lane of Pango to Jorging Road from Design Km 0+000 to Design Km 40+000 (Design Length: 40.00 Km, Package-I, Greenfield Alignment) in the State of Arunachal Pradesh on EPC mode Click Here

  • NIT
Arunachal Pradesh14-03-2024
3209

    RFP for the work of Construction of Tunnel/Cavity Car Parking at Kempty Fall Mussoorie on NH-707A (Mussoorie to Chakrata) under District Tehri Garhwal in the State of Uttarakhand on EPC Mode Click Here

  • NIT
  • DCA
  • Drawings
  • Corrigendum No. 1
Uttarakhand19-03-2024
3210

    RFP for Consultancy Services as Authority’s Engineer for Supervision of construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from designKm 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode. Click Here

  • NIT