Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Special Repair of NH-702, from Mon to Tizit Stretch (from Km 133.00 to Km 177.00) [Total Length = 44.00 Km] in the State of Nagaland for the FY 2021-22 – 2 nd Call. Dated: 03-09-2021.

  • Read more about Technical Evaluation Result for Special Repair of NH-702, from Mon to Tizit Stretch (from Km 133.00 to Km 177.00) [Total Length = 44.00 Km] in the State of Nagaland for the FY 2021-22 – 2 nd Call. Dated: 03-09-2021.

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 8

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 8

Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BASAM TO TATHI FROM KM 0.000 TO KM 32.060 IN UPPER SUBANSIRI VALLEY DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021.

  • Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BASAM TO TATHI FROM KM 0.000 TO KM 32.060 IN UPPER SUBANSIRI VALLEY DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021.

Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BRUNI TO LAMA FROM KM 0.000 TO KM 32.800 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021.

  • Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BRUNI TO LAMA FROM KM 0.000 TO KM 32.800 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021.

Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Ngopa – Pawlrang section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 32.796 to Km 72.030 [Design Chainage Km 31.280 to Km 68.170] (Package-II) in

  • Read more about Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Ngopa – Pawlrang section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 32.796 to Km 72.030 [Design Chainage Km 31.280 to Km 68.170] (Package-II) in

Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Khawkawn(from Bridge across River Tuivai) – Ngopa section of NH102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 to km 32.796 [Design Chainage Km 0.000

  • Read more about Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Khawkawn(from Bridge across River Tuivai) – Ngopa section of NH102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 to km 32.796 [Design Chainage Km 0.000

Technical Evaluation Result for Special Repair work of construction of RCC Cover drain, earthen drain and Pipe culverts at different location under Sabroom Sub-Division, South Tripura District along the National Highway – 08 in the State of Tripura. Dated

  • Read more about Technical Evaluation Result for Special Repair work of construction of RCC Cover drain, earthen drain and Pipe culverts at different location under Sabroom Sub-Division, South Tripura District along the National Highway – 08 in the State of Tripura. Dated

Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated: 26-08-2021.

  • Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated: 26-08-2021.

Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.

  • Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.

Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.

  • Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 37
  • Page 38
  • Page 39
  • Page 40
  • Current page 41
  • Page 42
  • Page 43
  • Page 44
  • Page 45
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 195194