Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 4: Lamayuru-Leh). Dated: 13-08-2021.

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 4: Lamayuru-Leh). Dated: 13-08-2021.

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 3: Kargil-Lamayuru). Dated: 13-08-2021.

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 3: Kargil-Lamayuru). Dated: 13-08-2021.

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 2: Minamarg-Kargil). Dated: 13-08-2021.

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 2: Minamarg-Kargil). Dated: 13-08-2021.

Revised Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in

  • Read more about Revised Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in

Technical Evaluation Result for Supply, Installation, Testing and Commissioning of 01No. Diesel Generator Set (30kVA, Single Phase) for NHIDCL, Regional Office at Itanagar. Dated: 11-08-2021.

  • Read more about Technical Evaluation Result for Supply, Installation, Testing and Commissioning of 01No. Diesel Generator Set (30kVA, Single Phase) for NHIDCL, Regional Office at Itanagar. Dated: 11-08-2021.

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 1: Srinagar-Minamarg). Dated: 10-08-2021.

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 1: Srinagar-Minamarg). Dated: 10-08-2021.

Technical Evaluation Result for Repair & Maintenance of NH-37 Missa Army Area from Km 301.800 to Km 307.700 under Risk & Cost of the EPC Contractor.(Item Rate and Work Order Basis). Dated: 07-08-2021.

  • Read more about Technical Evaluation Result for Repair & Maintenance of NH-37 Missa Army Area from Km 301.800 to Km 307.700 under Risk & Cost of the EPC Contractor.(Item Rate and Work Order Basis). Dated: 07-08-2021.

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State o

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State o

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State o

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State o

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: i) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PK

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: i) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PK

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 39
  • Page 40
  • Page 41
  • Page 42
  • Current page 43
  • Page 44
  • Page 45
  • Page 46
  • Page 47
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 195194