Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna
Technical Evaluation Result for Restoration and Repairs (R&R)/Strengthening to Single Lane with Earthen Shoulder of Srirampur to Dhubri section of Newly declared NH-127B (old Village road) from Existing Km 7.700 to Km 24.400 (Gossaigaon- Tamahat Road), Read more about Technical Evaluation Result for Restoration and Repairs (R&R)/Strengthening to Single Lane with Earthen Shoulder of Srirampur to Dhubri section of Newly declared NH-127B (old Village road) from Existing Km 7.700 to Km 24.400 (Gossaigaon- Tamahat Road),
Technical Evaluation Result for Four laning of Jorhat – Jhanji section of NH-37 from km 453.000 to km 491.050 (Design km 453.000 to km 491.800) in the State of Assam under SARDP-NE, on EPC basis. Dated: 20-09-2021. Read more about Technical Evaluation Result for Four laning of Jorhat – Jhanji section of NH-37 from km 453.000 to km 491.050 (Design km 453.000 to km 491.800) in the State of Assam under SARDP-NE, on EPC basis. Dated: 20-09-2021.
Technical Evaluation Result for Four laning of Jorhat – Jhanji section of NH-37 from km 453.000 to km 491.050 (Design km 453.000 to km 491.800) in the State of Assam under SARDP-NE, on EPC basis. Dated: 20-09-2021. Read more about Technical Evaluation Result for Four laning of Jorhat – Jhanji section of NH-37 from km 453.000 to km 491.050 (Design km 453.000 to km 491.800) in the State of Assam under SARDP-NE, on EPC basis. Dated: 20-09-2021.
Technical Evaluation Result for Four laning of Jorhat – Jhanji section of NH-37 from km 453.000 to km 491.050 (Design km 453.000 to km 491.800) in the State of Assam under SARDP-NE, on EPC basis. Dated: 20-09-2021. Read more about Technical Evaluation Result for Four laning of Jorhat – Jhanji section of NH-37 from km 453.000 to km 491.050 (Design km 453.000 to km 491.800) in the State of Assam under SARDP-NE, on EPC basis. Dated: 20-09-2021.
Technical Evaluation Result for Four laning from Biswanath Chariali by-pass (Km 208.00 to Gohpur Km 265.50 in the state of Assam on EPC basis Under SARDP-NE. Dated: 20-09-2021. Read more about Technical Evaluation Result for Four laning from Biswanath Chariali by-pass (Km 208.00 to Gohpur Km 265.50 in the state of Assam on EPC basis Under SARDP-NE. Dated: 20-09-2021.
Technical Evaluation Result for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – Read more about Technical Evaluation Result for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length –
Technical Evaluation Result for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – Read more about Technical Evaluation Result for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length –
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2021-22, 2 nd Call. Dated: 13-09-2021. Read more about Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2021-22, 2 nd Call. Dated: 13-09-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 8 Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 8