Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode-2nd Call. Dated: 11-10-2021. Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode-2nd Call. Dated: 11-10-2021.
Technical Evaluation Result for Restoration & Rehabilitation of NH -37 of Imphal-Jiribam Road (Km 145.00 to Km 221.138) [Total Length = 76.138 km] in the state of Manipur in the year 2021-2022 (3 rd Call). Dated: 08-10-2021. Read more about Technical Evaluation Result for Restoration & Rehabilitation of NH -37 of Imphal-Jiribam Road (Km 145.00 to Km 221.138) [Total Length = 76.138 km] in the state of Manipur in the year 2021-2022 (3 rd Call). Dated: 08-10-2021.
Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021. Read more about Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.
Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021. Read more about Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.
Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I).. Dated: 06-10 Read more about Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I).. Dated: 06-10
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+ Read more about Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+
Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a Read more about Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a
Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a Read more about Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a