Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+4 Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+4
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District of the state of Arunachal Pradesh on E Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District of the state of Arunachal Pradesh on E
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM LAMINO TO LONGCHU FROM KM 0.000 TO KM 60.514 IN EAST KAMENG IN THE STATE OF ARUNACHAL PRADESH ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (THE “EPC”) MODE. Dated: 29-07-2021. Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM LAMINO TO LONGCHU FROM KM 0.000 TO KM 60.514 IN EAST KAMENG IN THE STATE OF ARUNACHAL PRADESH ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (THE “EPC”) MODE. Dated: 29-07-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of TulungiaJogighopa B Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of TulungiaJogighopa B
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of TulungiaJogighopa B Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of TulungiaJogighopa B
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 22-07-2021. Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 22-07-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 22-07-2021. Read more about Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 22-07-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 lane road from Tetwal (Kashmir) to Drass (Ladakh) in the UT of Jammu & Kashmir and Ladakh. Dated: 22-07-2021. Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 lane road from Tetwal (Kashmir) to Drass (Ladakh) in the UT of Jammu & Kashmir and Ladakh. Dated: 22-07-2021.
Minutes of Financial Evaluation Committee for Empanelment of banks for implementing – Central land acquisition compensation fund management system. Read more about Minutes of Financial Evaluation Committee for Empanelment of banks for implementing – Central land acquisition compensation fund management system.