Technical Evaluation Result for Four laning of Kolasib – Sethawn section (Package-5) of NH-6 from Existing Chainage km 86+000 to km 107+850 (Design Chainage km 77+500 to km 95+500) on Silchar – Vairengte – Sairang road in the State of Mizoram under Bha Read more about Technical Evaluation Result for Four laning of Kolasib – Sethawn section (Package-5) of NH-6 from Existing Chainage km 86+000 to km 107+850 (Design Chainage km 77+500 to km 95+500) on Silchar – Vairengte – Sairang road in the State of Mizoram under Bha
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) “ Rehabilitation and up-gradation of road from km 16+077 to km 43+935 of Lalchara- Kanchanpur via Shivbari section of Manu-Simlung road on NH-44A to tw Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) “ Rehabilitation and up-gradation of road from km 16+077 to km 43+935 of Lalchara- Kanchanpur via Shivbari section of Manu-Simlung road on NH-44A to tw
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phas Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phas
Technical Evaluation Result for Construction of Balance Work of 2 Lane with Paved Shoulders of Joram- Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] in the State of Ar Read more about Technical Evaluation Result for Construction of Balance Work of 2 Lane with Paved Shoulders of Joram- Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] in the State of Ar
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146+246 to Km 157+460 (Design Chainage145+712 to 156+634) of Dillai- Lahorijan (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 10-01-2022. Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146+246 to Km 157+460 (Design Chainage145+712 to 156+634) of Dillai- Lahorijan (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 10-01-2022.
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Island Read more about Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Island
Technical Evaluation Result for EXPRESSION OF INTEREST (EOI) for Authority’s Engineer for “Up-gradation /widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of National Highway (NH-127B) in the State of A Read more about Technical Evaluation Result for EXPRESSION OF INTEREST (EOI) for Authority’s Engineer for “Up-gradation /widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of National Highway (NH-127B) in the State of A
Technical Evaluation Result for Improvement/widening to Two-laning with earthen shoulder of Panda (Design Ch. 112.300 km) to Baghmara (Design Ch. 129.385 km )[R-M-B Package-VI] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Megh Read more about Technical Evaluation Result for Improvement/widening to Two-laning with earthen shoulder of Panda (Design Ch. 112.300 km) to Baghmara (Design Ch. 129.385 km )[R-M-B Package-VI] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Megh
Technical Evaluation Result for Four laning of Sethawn – N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under B Read more about Technical Evaluation Result for Four laning of Sethawn – N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under B
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu