Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 583+350 of NH 37 to km 606+300 of NH-37 on existing Lahoal – Chabua Bypass i.e. Borborua Junction – Kandulibari Grant Gaon section in the State of Assam on

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 583+350 of NH 37 to km 606+300 of NH-37 on existing Lahoal – Chabua Bypass i.e. Borborua Junction – Kandulibari Grant Gaon section in the State of Assam on

Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Ch. from Km 131.280 to Km 169.570 (PKG-6) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated :

  • Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Ch. from Km 131.280 to Km 169.570 (PKG-6) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated :

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 581+700 of NH 37 to km 606+300 of NH-37 on existing Dibrugarh- Lahoal – Chabua Bypass

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 581+700 of NH 37 to km 606+300 of NH-37 on existing Dibrugarh- Lahoal – Chabua Bypass

Technical Evaluation Result for Empanelment of Travel Agency for Booking of Air Tickets and Rail Tickets for journeys of NHIDCL’s officers and staff. Dated : 28-03-2022

  • Read more about Technical Evaluation Result for Empanelment of Travel Agency for Booking of Air Tickets and Rail Tickets for journeys of NHIDCL’s officers and staff. Dated : 28-03-2022

Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 59+400 km to Ch 107+000 km (Jarawa-I) in the Union Territory of Andaman and Nicobar Islands in the year 2022-23. Dated : 26-03-2022

  • Read more about Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 59+400 km to Ch 107+000 km (Jarawa-I) in the Union Territory of Andaman and Nicobar Islands in the year 2022-23. Dated : 26-03-2022

Technical Evaluation Result for Construction of 2 lane with Hard shoulder from Design Chainage Km 283.000 (5- legged junction at Old Akhegwo) to Design Chainage Km 325.440 (Akash Bridge) of Akegwo- Jessami section of NH-202 in the State of Nagaland on EPC

  • Read more about Technical Evaluation Result for Construction of 2 lane with Hard shoulder from Design Chainage Km 283.000 (5- legged junction at Old Akhegwo) to Design Chainage Km 325.440 (Akash Bridge) of Akegwo- Jessami section of NH-202 in the State of Nagaland on EPC

Technical Evaluation Result for Supply, Installation, Testing and Commissioning of 01No. Diesel Generator Set (50kVA, Three Phase) for NHIDCL, Regional Office at Imphal, Manipur in FY-2021-2022. Dated : 25-03-2022

  • Read more about Technical Evaluation Result for Supply, Installation, Testing and Commissioning of 01No. Diesel Generator Set (50kVA, Three Phase) for NHIDCL, Regional Office at Imphal, Manipur in FY-2021-2022. Dated : 25-03-2022

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Improvement/widening to Two laning with earthen shoulder of Nongjri (Design Ch. 30.00km) to Maheshkola (Design Ch. 55.525km) [R-M-B Package- II] on SH-4

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Improvement/widening to Two laning with earthen shoulder of Nongjri (Design Ch. 30.00km) to Maheshkola (Design Ch. 55.525km) [R-M-B Package- II] on SH-4

Technical Evaluation Result for Restoration and Repairs of NH-244 by laying Bituminous Concrete in selected stretches from Batote (Km 0.000) to Khellani (Km 45.000) and (Km 0.000) to (Km 8.000) of Paryote-Puldoda stetch (re-alignment portion) [Total le

  • Read more about Technical Evaluation Result for Restoration and Repairs of NH-244 by laying Bituminous Concrete in selected stretches from Batote (Km 0.000) to Khellani (Km 45.000) and (Km 0.000) to (Km 8.000) of Paryote-Puldoda stetch (re-alignment portion) [Total le

Technical Evaluation Result for Rehabilitation and up-gradation of road from km 16+077 to km 43+935 of Lalchara- Kanchanpur via Shivbari section of Manu-Simlung road on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-

  • Read more about Technical Evaluation Result for Rehabilitation and up-gradation of road from km 16+077 to km 43+935 of Lalchara- Kanchanpur via Shivbari section of Manu-Simlung road on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 29
  • Page 30
  • Page 31
  • Page 32
  • Current page 33
  • Page 34
  • Page 35
  • Page 36
  • Page 37
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 194938