Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Construction of Balance Work of 2 Lane with Paved Shoulders of Joram- Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] in the State of Ar

  • Read more about Technical Evaluation Result for Construction of Balance Work of 2 Lane with Paved Shoulders of Joram- Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] in the State of Ar

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146+246 to Km 157+460 (Design Chainage145+712 to 156+634) of Dillai- Lahorijan (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 10-01-2022.

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146+246 to Km 157+460 (Design Chainage145+712 to 156+634) of Dillai- Lahorijan (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 10-01-2022.

Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Island

  • Read more about Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Island

Technical Evaluation Result for EXPRESSION OF INTEREST (EOI) for Authority’s Engineer for “Up-gradation /widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of National Highway (NH-127B) in the State of A

  • Read more about Technical Evaluation Result for EXPRESSION OF INTEREST (EOI) for Authority’s Engineer for “Up-gradation /widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of National Highway (NH-127B) in the State of A

Technical Evaluation Result for Improvement/widening to Two-laning with earthen shoulder of Panda (Design Ch. 112.300 km) to Baghmara (Design Ch. 129.385 km )[R-M-B Package-VI] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Megh

  • Read more about Technical Evaluation Result for Improvement/widening to Two-laning with earthen shoulder of Panda (Design Ch. 112.300 km) to Baghmara (Design Ch. 129.385 km )[R-M-B Package-VI] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Megh

Technical Evaluation Result for Four laning of Sethawn – N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under B

  • Read more about Technical Evaluation Result for Four laning of Sethawn – N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under B

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mu

Technical Evaluation Result for Four laning of Vairengte – Chhimluang section (Package-3) of NH-306 from Existing Chainage km 43+000 to km 59+700 (Design Chainage km 46+000 to km 60+850) on Silchar – Vairengte – Sairang road in the State of Mizoram und

  • Read more about Technical Evaluation Result for Four laning of Vairengte – Chhimluang section (Package-3) of NH-306 from Existing Chainage km 43+000 to km 59+700 (Design Chainage km 46+000 to km 60+850) on Silchar – Vairengte – Sairang road in the State of Mizoram und

Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Pawlrang – Rulchawm section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage km 72.030 to km 104.129 including 2.459 km re-alignment section from Tuivawl

  • Read more about Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Pawlrang – Rulchawm section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage km 72.030 to km 104.129 including 2.459 km re-alignment section from Tuivawl

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 31
  • Page 32
  • Page 33
  • Page 34
  • Current page 35
  • Page 36
  • Page 37
  • Page 38
  • Page 39
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 194975