Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Restoration & Rehabilitation of NH -37 of Imphal-Jiribam Road (Km 145.00 to Km 221.138) [Total Length = 76.138 km] in the state of Manipur in the year 2021-2022 (3 rd Call). Dated: 08-10-2021.

  • Read more about Technical Evaluation Result for Restoration & Rehabilitation of NH -37 of Imphal-Jiribam Road (Km 145.00 to Km 221.138) [Total Length = 76.138 km] in the state of Manipur in the year 2021-2022 (3 rd Call). Dated: 08-10-2021.

Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.

  • Read more about Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.

Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.

  • Read more about Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.

Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I).. Dated: 06-10

  • Read more about Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I).. Dated: 06-10

Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+

  • Read more about Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+

Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a

  • Read more about Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a

Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a

  • Read more about Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a

Technical Evaluation Result for Award of rate contract for repair and maintenance (including supply of requisite materials/part) of office furniture & fixture and day to day items, plumbing, carpentry work, etc. at National Highways Infrastructure Develop

  • Read more about Technical Evaluation Result for Award of rate contract for repair and maintenance (including supply of requisite materials/part) of office furniture & fixture and day to day items, plumbing, carpentry work, etc. at National Highways Infrastructure Develop

Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna

  • Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna

Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna

  • Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 34
  • Page 35
  • Page 36
  • Page 37
  • Current page 38
  • Page 39
  • Page 40
  • Page 41
  • Page 42
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 195125